• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Indonesia
Anjing Hitam - Lae Jahe Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
18 km W from Sidikalang, Indonesia

  Project Contacts:
Jl. Runding No. 1 A, Gerbang III-Sidiangkat
Sidikalang
Indonesia
22216
Phone  ...  Subscription required
Fax+62-627-424427
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Indonesia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageConstruction
Mine TypeUnderground
Commodities
  • Zinc
  • Lead
Mining Method
  • Cut & Fill
  • Longhole open stoping
  • Bench stoping
  • Paste backfill
Processing
  • Filter press plant
  • Dewatering
  • Crush & Screen plant
  • Flotation
Mine Life15 years (as of Jan 1, 2020)
The Anjing Hitam and Lae Jahe mine sites concessions combined contain one of the best quality zinc in the world (11.5% Zn; 6.8% Pb).

Currently, constructing the infrastructure facilities and securing the funding for Anjing Hitam mine site.


Owners

Source: p. 17,58
CompanyInterestOwnership
PT Bumi Resources Tbk. 15.37 % Indirect
China Nonferrous Metal Industry’s Foreign Engineering & Cons 51 % Indirect
PT Dairi Prima Mineral (operator) 100 % Direct
PT Bumi Resources Minerals Tbk. holds 49% in PT Dairi Prima Mineral and China Nonferrous Metal Industry’s Foreign Engineering & Construction Co. Ltd holds 51% in PT Dairi Prima Mineral.

Composition of the PT Bumi Resources Minerals Tbk’s Shareholders:
31.36% - PT Bumi Resources Tbk.;
20.82% - Wexler Capital Pte. Ltd.;
20.07% - 1st Financial Company Limited;
15.32% - Public;
7.04% - Fountain City Investment Ltd;
5.39% - PT Biofuel Indo Sumatra.

Deposit Type

  • Vein / narrow vein
  • Breccia pipe / Stockwork
  • SEDEX


Summary:

Zinc-Pb orebodies in the Dairi deposit are distributed along a 4-km SE-NW strike in the eastern flank of the Sopokomil Dome. From top downward, the rocks in the Sopokomil Dome consists of interbedded calcareous siltstones-sandstones (Dagang unit), interbedded carbonaceous shales-calcareous siltstones (Julu unit) and massive as well as brecciated dolostones (Jehe unit).

The Anjing Hitam prospect is situated in the southeastern portion of the Dairi deposit. At the Anjing Hitam prospect, orebodies are hosted in the Julu unit and display stratiform and concordant morphologies.

Two mineralized horizons are present, namely the upper and main mineralized horizons. The upper mineralized horizon occurs as lenses and it is sporadically distributed throughout the prospect while the main mineralized horizon is continuous. The orebodies attain maximum thickness of 30 m in the main mineralized horizon.

The Dagang and Julu units are composed of quartz, carbonate minerals, muscovite and organic matter. Quartz and carbonate minerals are dominant in the sandstones and siltstones layers of the Dagang and Julu units while muscovite and organic matter are dominant in the shales layers of the Julu unit. Zircon and sphalerite occur in trace amounts in the Dagang and Julu units.

According to ore minerals abundance and their textural relationship, the Anjing Hitam prospect hosts five ore types: (1) pyrite-rich massive ore, (2) sphalerite-rich massive ore, (3) bedded sulfide ore, (4) galena-rich breccia ore and (5) vein ore.

Pyrite-rich massive ore is composed of abundant pyrite with sphalerite-galena intergrowth in the interstices.

Sphalerite-rich massive ore is characterized by sphalerite-galena intergrowth with trace to minor amounts of pyrite.

Bedded sulfide ore is identified as interbedded host rocks and sulfide-rich layers with individual layer up to 1 cm thick.

The sulfide-rich layers are subdivided into pyrite-sphalerite-rich and galena-sphalerite-rich subtypes.

Galena-rich breccia ore consists of host rock fragments cemented by galena with trace amounts of tetrahedrite, bournonite and pyrrhotite. Coarse-grained pyrite up to 3 mm in size also occurs in this ore type.

Vein ore is associated with open-fracture filling in the host rocks and other ore types. This ore type is dominated by the sphalerite-galena intergrowth.


Mining Methods

  • Cut & Fill
  • Longhole open stoping
  • Bench stoping
  • Paste backfill


Summary:

There will be three portals: haulage, service and ventilation. The portals will be accessed via a surface haul road and mined conventionally (drill and blast). Mining methods will be mainly long hole open stoping, primary-secondary longitudinal bench stoping and cut & fill.

Mining voids will be filled with paste fill which will prevent subsidence, maximize resource recovery and limit the size of the tailings storage facility (TSF). Ore and waste will be trucked to the surface via the haulage decline to a run of mine (ROM) ore transit storage area.

Waste rock will be used for the backfill of avoids in the mine and for the construction of the TSF. Ground support will be a combination of bolts and mesh, shotcrete/fibrecrete, cable bolting, rock fill and paste fill.

The ventilation circuit will consist of two (2) fresh air intakes via haulage and service portals and a series of rises to bring fresh air to the production areas. Exhaust is via a parallel system of ventilation rises and drives connected to the ventilation portal.

Water management will consist of development sumps, transfer sumps and pumps, including a main pumping station and a surface settlement pond.


Crushing and Grinding
Crusher / Mill TypeModelSizePowerQuantity
Jaw crusher 1
Cone crusher 1
Ball mill 1
Regrind 2


Processing

  • Filter press plant
  • Dewatering
  • Crush & Screen plant
  • Flotation

Source: Subscription required

Summary:

From the ROM, Ore will be sent to processing plant for crushing and processing.

The plant and equipment for a one million tonnes per annum (Mtpa) ore processing plant equipment is in storage and care in Medan awaiting fabrication at the mine site. The plant is designed to produce high grade zinc and lead sulfide concentrates at the rate of up to 225,000 tonnes of zinc sulfide and 105,000 tonnes of lead sulfide per annum.

After trucking from the underground workings to a run of mine (ROM) storage area, ore will enter the plant for processing.

The processing stage will commence with the ore undergoing single stage jaw crushing, semi-autogenous grinding (SAG) and ball milling, flotation, thickening, filtration and drying.

Much of the bulk tailings from the processing plant will be sent to a paste plant for blending with cement to form a paste which will be injected back underground as backfill for empty mine workings. The remaining tailings wil ........


Projected Production:

CommodityUnitsAvg. Annual
Zinc kt 225
Lead kt  ......  Subscription required
All production numbers are expressed as concentrate.

Operational Metrics:

Metrics
Annual processing capacity  ......  Subscription required
* According to 2021 study.
Subscription required - Subscription is required.

Reserves at February 1, 2011:
No new Mineral Resources and Reserves reported.

CategoryTonnage CommodityGrade
Proven & Probable 11.05 Mt Zinc 11.5 %
Proven & Probable 11.05 Mt Lead 6.8 %
Total Resource 25.1 Mt Zinc 10.1 %
Total Resource 25.1 Mt Lead 6 %

Commodity Production Costs:

CommodityUnitsAverage
Assumed price Zinc USD 1,900 / t *
* According to 2017 study / presentation.

Financials:

Units2020
Capital expenditures M USD  ......  Subscription required
Subscription required - Subscription is required


Heavy Mobile Equipment as of April 1, 2021:
HME TypeSize
Crane 50 t
Drill jumbo (two boom)
Scissor Lift
Truck (service)

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 13, 2021
....................... Subscription required ....................... Subscription required Subscription required Sep 13, 2021
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2020

Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
Other 2017
Other 2017
Subscription required - Subscription is required.

Aerial view:

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2022 MDO Data Online Inc.