Mining Intelligence and Sales Leads
Australia

Robe Valley Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotRobe Valley operation consists of Mesa A and Mesa J Hubs.

Mesa A Hub includes Mesa A/Warramboo, Mesa B, Mesa C deposits, crushing, screening facilities, Mesa A wet processing plant, as well as other support infrastructure.

Mesa J Hub includes Mesa H, Mesa J and Mesa K (Mesa K Remnant Mining Project) deposits, as well as Mesa J wet plants and other support infrastructure.

As of March 2025, Robe River Mining Company is proposing to expand existing iron ore mining in order to sustain operations at Robe Valley. The Proposed Action is scheduled to commence in 2028, with first ore in 2031.

The Proposed Action will utilize much of the same key infrastructure including ore processing facilities and rail infrastructure.

Owners

SourceSource
CompanyInterestOwnership
Nippon Steel Corp. 14 % Indirect
Mitsui & Co., Ltd. 33 % Indirect
Rio Tinto plc 53 % Indirect
Robe River Iron Associates JV (operator) 100 % Indirect
Robe River Iron Associates (Robe River) is a joint venture between Rio Tinto (53%), Mitsui Iron Ore Development (33%), and Nippon Steel Corporation (14%).

Deposit type

  • Channel Iron (CID)

Summary:

Robe Valley deposits: goethite mineralisation occurs as pisolite ores within the paleo-channel of a channel iron formation. Some detrital mineralisation also occurs.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits20252024202320222021202020192018201720162015
Iron Ore kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 26,951 31,947 31,182 32,776 32,482
All production numbers are expressed as lump & fines.

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 30, 2026
....................... Subscription required ....................... Subscription required Subscription required Mar 30, 2026
....................... Subscription required ....................... Subscription required Subscription required Mar 30, 2026

Workforce

Aerial view:

Lock

- subscription is required.