Overview
Stage | Production |
Mine Type | Underground |
Commodities |
- Copper
- Nickel
- Gold
- Platinum
- Palladium
|
Mining Method |
- Undercut mining
- Back stoping
- Backfill
|
Production Start | ...  |
Mine Life | 5 years (as of Jan 1, 2021) |
The Sudbury Basin, comprising the Morrison/Levack mine, the McCreedy mine and the pre-operational Victoria project.
Since April 2019 mining has only been conducted in the underground McCreedy West mine, due to the fact that the Morrison/Levack mine has been placed into Care & Maintenance. |
Source:
p. 57
OWNERSHIP: 100% KGHM POLSKA MIEDZ S.A.
Contractors
- Subscription is required.
Deposit Type
- Vein / narrow vein
- Breccia pipe / Stockwork
- Footwall hosted
Summary:
At the McCreedy West Mine, mineralization occurs as Contact and Footwall Deposits. Historic and current operations exploit both Contact Ni-Cu mineralization along the base of SIC within Sublayer Norite and granite breccia-filled embayments, and Footwall Cu-Ni- PGM mineralization in the footwall Sudbury Breccia environment.
The Contact Deposits on the property (Inter Main, Upper Main, and East Main), are related to a suite of sulphide and inclusion-rich sublayer norites and leucocratic granitic breccias. The orebodies occupy embayment structures and traps that often penetrate into the footwall of the SIC. These embayment structures are characterized by significant thickening of the mafic norite and sublayer units accompanied by thicker zones of granite breccia. Hanging-wall rocks composed of basal mafic norite and felsic norite of the main SIC overlie the contact mineralized zones. Brecciated rocks of the Levack Complex consisting of granodiorite, granodiorite gneiss and migmatites form the footwall to the deposits.
The Footwall Type Cu-Ni-PGM vein deposits are represented by the 700 Vein Complex; 950 Vein Complex; and the PM Deposit. These are now regarded as one deposit with a progression from sharpwalled massive chalcopyrite veins in the 700 Deposit passing down through the 950 (now referred to as the Upper PM) to the PM Deposit where mineralization occurs both within veins and as matrix fill within the Sudbury.
Contact-Type Ni-Cu Depos ........

Mining Methods
- Undercut mining
- Back stoping
- Backfill
Summary:
Extraction is through mining methods which are dependent on the geometry of the deposit – mainly a mechanised method of selective extraction using undercutting of successive levels from bottom to top at various mine levels.
In order to decrease depletion and increase the amount of ore in areas with thin veins, conventional back stoping of ore is applied.
Flow Sheet:
Summary:

- subscription is required.
Reserves at December 31, 2014:
Category | Tonnage | Commodity | Grade | Contained Metal |
Measured & Indicated
|
12,972,000 t
|
Copper
|
0.91 %
|
118,467 t
|
Measured & Indicated
|
12,972,000 t
|
Nickel
|
1.25 %
|
161,773 t
|
Measured & Indicated
|
12,972,000 t
|
Gold
|
0.07 g/t
|
29,707 oz
|
Measured & Indicated
|
12,972,000 t
|
Platinum
|
0.17 g/t
|
68,867 oz
|
Measured & Indicated
|
12,972,000 t
|
Palladium
|
0.23 g/t
|
93,977 oz
|
Inferred
|
4,594,000 t
|
Copper
|
1.16 %
|
53,095 t
|
Inferred
|
4,594,000 t
|
Nickel
|
1.43 %
|
65,529 t
|
Inferred
|
4,594,000 t
|
Gold
|
0.16 g/t
|
24,338 oz
|
Inferred
|
4,594,000 t
|
Platinum
|
0.41 g/t
|
59,897 oz
|
Inferred
|
4,594,000 t
|
Palladium
|
0.58 g/t
|
84,942 oz
|
- Subscription is required.