Fayolle Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
25 km NE from Rouyn-Noranda, Quebec, Canada

  Project Contacts:
401 Bay Street, Suite 3200
Toronto
Ontario, Canada
M5H 2Y4
Phone  ...  Subscription required
Fax416-360-4750
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Canada
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StagePermitting
Mine TypeOpen Pit
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life2024
Fayolle property is pending permit approval and may provide incremental feed commencing in 2023.


Owners

Source:
CompanyInterestOwnership
IAMGOLD Corp. 100 % Indirect
June 8, 2020 - Monarch Gold Corporation is pleased to announce the closing of the sale of the Fayolle property to IAMGOLD Corporation ("IAMGOLD") (TSX: IMG) (NYSE: IAG) for a total consideration of $11.5 million.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Intrusion related
  • Porphyry
  • Breccia pipe / Stockwork


Summary:

Intrusion-associated disseminated sulphide mineralization is commonly found along the PDMFZ and, as its name implies, is spatially related to porphyritic intrusions. Two areas have a large number of these mineralized zones: the periphery of the Duparquet basin and the Fayolle deposit area. Two subtypes have been identified based on intrusion composition: calc-alkaline and alkaline (Legault et al., 2006). The Fayolle occurrence has been described in the past as a calc-alkaline quartz-feldspar porphyry (QFP) or feldspar-porphyry (FP) intrusion-related disseminated sulphide deposit (Legault et al., 2006). However, the newly geological understanding of the Fayolle deposit differs from this earlier description.

The Fayolle deposit is characterized by the komatiite flows of the Lanaudiere Formation (Goutier, 1997) intruded by a swarm of quartz-feldspar porphyry and/or feldspar porphyry dykes. A post-intrusive brecciation event seems to control gold deposition. The breccia zones mostly affect the ultramafic flows, but also locally contain felsic dyke fragments.

The northern part of the Fayolle Property is underlain primarily by the Lanaudière Formation, which corresponds to the summit of the Kinojevis Group. Basalt is the dominant rock type, and basalt layers are intercalated with felsic and ultramafic rocks. Also observed are ultramafic flows, magnesian basalt, and komatiite characterized by breccia, cumulates and spinifex texture. The east-trending Manneville ........


Mining Methods

  • Truck & Shovel / Loader


Summary:

According to InnovExplo, the conventional open pit option is the better way to successfully mine the deposit and extract the most resources while minimizing the economic risk.

Mining will be undertaken by contractors using conventional truck and shovel equipment.

Overburden removal equipment:
- 1 Caterpillar 365 hydraulic excavator
- 4 Caterpillar 735 trucks
- 1 Caterpillar D6 dozer
Production equipment:
- 1 Caterpillar 385 hydraulic excavator
- 4 Caterpillar 770 trucks
- 1 Tamrock DX-800 drill
- 1 Caterpillar D7 dozer


Crushing and Grinding
Flow Sheet: Source

Ore Handling and Crushing
Underground ore is hoisted to surface and hauled by truck to the processing facility located 2.5km from the mine shaft. The ore is discharged at the crusher house. The ore is fed to a single stage jaw crusher (1.07 x 1.22m) by a front-end loader through a grizzly feeder. The ore is conveyed to the mill ore bins using a belt conveyor system. Each bin has a capacity of 2,800dmt.

Grinding and Gravity
Grinding of the Westwood ore is done using a 2,700HP semi-autogenous grinding (SAG) mill in closed circuit with primary hydrocyclones. The overflow of primary hydrocyclones feeds a 1,000-HP ball mill in closed circuit with its secondary hydrocyclones. A portion of the underflow (secondary hydrocyclones) feeds the gravity separation circuit composed of a sweco screen, Knelson concentrator (30’’) and a shaking table. The tail of the gravity circuit returns to the grinding circuit and the gravity gold concentrate goes to the refinery. The targeted grind size is 80% passing 53 microns (270 mesh).


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Projected Production:

CommodityUnitsLOM
Gold oz 74,813
All production numbers are expressed as metal in doré.

Operational Metrics:

Metrics
Stripping / waste ratio 3.7 *
Daily ore mining rate 1,000 t *
Annual mining capacity 350,000 t *
Waste tonnes, LOM 2,092,148 t *
Ore tonnes mined, LOM 568,941 t *
Total tonnes mined, LOM 3,937,889 t *
* According to 2013 study.

Reserves at August 30, 2019:
Cut-off grades of 0.9 g/t Au (in-pit) and 2.2 g/t Au (underground)

CategoryOreTypeTonnage CommodityGradeContained Metal
Indicated In-Situ (OP) 405,600 t Gold 5.42 g/t 70,630 oz
Indicated In-Situ (UG) 300,800 t Gold 4.17 g/t 40,380 oz
Indicated Total 706,400 t Gold 4.89 g/t 111,010 oz

2013 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Pre-Production capital costs $M CAD  ......  Subscription required
Sustaining CapEx $M CAD  ......  Subscription required
Closure costs $M CAD  ......  Subscription required
Total CapEx $M CAD  ......  Subscription required
Total OpEx $M CAD  ......  Subscription required
Total Taxes $M CAD  ......  Subscription required
Royalty payments $M CAD  ......  Subscription required
Gross revenue (LOM) $M CAD  ......  Subscription required
Net revenue (LOM) $M CAD  ......  Subscription required
Pre-tax Cash Flow (LOM) $M CAD  ......  Subscription required
After-tax Cash Flow (LOM) $M CAD  ......  Subscription required
Pre-tax NPV @ 7% $M CAD  ......  Subscription required
After-tax NPV @ 7% $M CAD  ......  Subscription required
Pre-tax IRR, %  ......  Subscription required
After-tax IRR, %  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.


Proposed Heavy Mobile Equipment as of March 28, 2013:
HME TypeModelQuantityLeased or
Contractor
Dozer ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 27, 2022
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2022
Corporate Presentation 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
Annual Information Form 2015
Preliminary Economic Assessment 2013