Record Ridge Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
14 km SW from Trail, British Columbia, Canada

  Project Contacts:
P.O Box 68121
Calgary
Alberta, Canada
T3G 3N8
Phone  ...  Subscription required
Fax403.206-7159
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Canada
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StagePermitting
Mine TypeOpen Pit
Commodities
  • Magnesium
Mining Method
  • Truck & Shovel / Loader
Mine Life20 years (as of Jan 1, 2022)
World Class advanced-stage project expected permit shovel ready in 2023.
Latest NewsWest High Yield (W.H.Y.) Resources Ltd. Announces First Tranche Closing of Oversubscribed Private Placement     December 23, 2022


Owners

Source: p. 5
CompanyInterestOwnership
West High Yield Resources Ltd. 100 % Direct
100% owned by West High Yield Resources Ltd.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Magmatic


Summary:

The Record Ridge area is located within the Quesnel Terrain of the Intermontane Belt. It is comprised of a highly deformed Jurassic (180 Ma) age volcanic island arc-back arc basin complex intruded by Tertiary volcanic and plutonic rocks

Mineralization containing economically significant concentrations of Mg is known to occur in the ultramafic rocks which have undergone serpentinization. This rock type makes up the predominant lithology described at the Project, and occurs widespread. Lower concentrations of Mg within the serpentinite are present in dioritic intrusive rocks and lenses of andesite/gabbro.


Mining Methods

  • Truck & Shovel / Loader


Summary:

The proposed Project mine plan will be a conventional truck and shovel open pit operation which includes drilling, blasting, loading and hauling of mineralized ore.


Crushing and Grinding

The mine product material will have primary and secondary crushing on-site before being loaded to the processing facility.


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Projected Production:

CommodityUnitsAvg. AnnualLOM
Magnesium t 86,5001,728,800
All production numbers are expressed as oxide.

Operational Metrics:

Metrics
Annual processing capacity  ......  Subscription required
Annual ore mining rate  ......  Subscription required
* According to 2022 study.
Subscription required - Subscription is required.

Reserves at June 3, 2013:
Resource Cut-off 21.9%Mg

CategoryTonnage CommodityGradeContained Metal
Measured 28.4 Mt Magnesium 24.82 % 7.05 Mt
Indicated 14.6 Mt Magnesium 24.21 % 3.54 Mt
Measured & Indicated 43 Mt Magnesium 24.61 % 10.59 Mt
Inferred 1.07 Mt Magnesium 24.37 % 0.26 Mt

Commodity Production Costs:

CommodityUnitsAverage
Cash costs Magnesia USD  ......  Subscription required&nbs
Assumed price Magnesia USD  ......  Subscription required&nbs
* According to 2022 study / presentation.
Subscription required - Subscription is required.

2022 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscription required
Total OpEx $M USD  ......  Subscription required
Income Taxes $M USD  ......  Subscription required
Gross revenue (LOM) $M USD  ......  Subscription required
After-tax Cash Flow (LOM) $M USD  ......  Subscription required
Pre-tax NPV @ 5% $M USD  ......  Subscription required
After-tax NPV @ 5% $M USD  ......  Subscription required
Pre-tax IRR, %  ......  Subscription required
After-tax IRR, %  ......  Subscription required
Pre-tax payback period, years  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.


Heavy Mobile Equipment:

Mine Management:

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Dec 2, 2022
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2022
Corporate Presentation 2022
Pre-Feasibility Study Report 2022
Press Release 2022
Press Release 2022
Press Release 2018
Preliminary Economic Assessment 2013
Subscription required - Subscription is required.

News:

NewsDate
West High Yield (W.H.Y.) Resources Ltd. Announces First Tranche Closing of Oversubscribed Private Placement December 23, 2022