Mining Intelligence and News
Indonesia

Gunungbayan Pratamacoal (GBP) Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
  • Coal (metallurgical)
  • Coal (semi-soft coking)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotGunungbayan Pratamacoal (GBP) has a total concession area of 20,275 hectares divided into 2 blocks: GBP Block 1 and Block 2.

In 2019, GBP Block 2 has suspended mining operations. GBP Block 2 produced high calorific coal of up to 6,500 kcal/ Kg GAR.

GBP Block 1 has a small deposit of semi-soft coking coal.

GBP mine resumed mining in Q2 2024 and coal production in Q3 2024.



.

Owners

SourceSource
CompanyInterestOwnership
PT Bayan Resources Tbk. 92.7 % Indirect
PT Bayan Resources Tbk. indirectly hold 92.7% in PT Gunungbayan Pratamacoal (GBP).

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

GBP has a total concession area of 20,275 hectares divided into 2 blocks: GBP Block 1 and Block 2.

GBP Block 2 produced high calorific coal of up to 6,500 kcal/ Kg GAR and GBP Block 1 has a small deposit of semi-soft coking coal.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

2024: Restart coal production in Q3 2024.
CommodityUnits2024201920182017
Coal (metallurgical & thermal) Mt  ....  Subscribe
Coal (thermal) Mt 0.40.40.1
All production numbers are expressed as ROM coal. ^ Guidance / Forecast.

Operational metrics

Metrics201920182017
Coal tonnes mined 0.4 Mt0.4 Mt0.1 Mt
Stripping ratio 14.1 bcm/t
Waste
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 20, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 18, 2025

Aerial view:

Lock

- subscription is required.