Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Processing |
|
The current concession area has been divided into five mining blocks: Kusan Girimulya (KG), Batulaki South (BS), Sebamban South (SS), Sebamban North (SN) and Pasopati (PP). Mining has been carried out in four blocks - Kusan (KG), Batulaki South (BS), Sebamban South (SS) and Sebamban North (SN).
KG Block still remains as the main operating block to support BIB's enhanced production along with some production from SN and BS Blocks. GEAR is proposing to recommence production at SS Block and PP Block during 2023. |
Source:
p. 20
GEAR holds the mining rights to the BIB concession through its subsidiary PT Roundhill Capital Indonesia (Net 65.7235%). Tenure at the BIB concession is held under the second generation PKP2B. PKP2B was originally executed between PT Borneo Indobara and PT Tampang Batubara Bukit Asama, a government-owned company for an area of 93,164 ha.
Summary:
The coal deposits found within the BIB coal concession area are located within the Asem Asem Basin of South-eastern Kalimantan. The Asem Asem Basin has been previously termed the Pasir or Asem Asem sub-basin to the larger Barito Basin.
The BIB coal concession area has a general inverted U shape which follows both limbs of a synclinal structure with an approximate north-northeast trending synclinal axis. The seams generally display shallow dips of around 20 degrees but dips can increase locally up to around 60 degrees. The entire Pasopati resource area, which is adjacent to obducted basement volcanic and ophiolites, exhibits dips of around 60 degrees. The increased dip in the Pasopati resource area is associated with increased coal rank, as seen from the fact that coals in the Pasopati area have in general higher calorific values compared to coals in the rest of the concession.
Structure within the area is relatively benign, with most of the significant faults in the area consisting of the north-east trending thrust faults that follow the general trend of the fold axes. Normal and block faulting is seen mainly in the basement (Pre-Tertiary) rocks (Panggabean, 1991). However, localised increase in seam dips have been observed in the coal models constructed for resource estimation purposes and this may be due to as yet un-mapped faults.
Kusan Girimulya (KG Block)
The deposit at KG Block contains approximately 54 modelled coal seams of which 20 have been split into upper and lower plies. Some seams are less continuous than others and have been modelled to pinch out were not present in a particular drill hole. In particular the D1 seam has a limited extent through the deposit due to the fact that has not been correlated in the majority of holes drilled. In contrast, the BL2U seam is one of the most continuous seams and is present throughout the deposit. This resource area covers the eastern outcrop of the Warukin formation coals and seams dip shallowly to the west. The coal quality is low rank with high inherent moisture and low ash and sulphur contents. This area is currently being mined.
Batulaki South (BS Block)
This resource area is situated on the western flank of the syncline and seams consequently dip to the east. Seams in this area also form part of the Warukin Formation with coal quality characteristics that are very similar to KG, SS Block and SN Block areas. There are 40 named and correlated seams in this area. No correlation between the Warukin coals across the western and eastern limbs of the syncline has been undertaken.
Sebamban South (SS Block)
Warukin Formation coal seams occur in this resource area, dipping shallowly to the west. There are 20 named and correlated seams including splits that have been identified in this area. The coal quality is similar to the KG, BS Block and SN Block areas but no correlation of seams between these areas has been made to date.
Sebamban North (SN Block)
This resource area is found immediately north of the SS Block and has many characteristics in common with SS Block coals. Warukin Formation coal seams dip shallowly to the west and 22 seams have been named and correlated across the area. The coal quality is similar to the KG, BS Block and SS Block areas.
Pasopati (PP Block)
The coal seams in this resource area belong to the Tanjung Formation and are therefore older than the Warukin Formation coals found in the rest of the concession. The coal is steeply dipping (60 degrees) to the east and exhibits higher rank and resultant higher energy. There are 13 named and correlated seams in this area. The area has not been officially mined to date but has been extensively worked by artisanal miners in the past due to the prized high quality of the coal in this area. This area has not been mined yet, however it is planned to be mined from 2023 onwards.
Within the BIB concession, Warukin Formation coals are classified as a low energy sub-bituminous class B coal (ASTM Guidebook of Thermal Coal page 35). The Tanjung Formation coals in the PP Block are classified as Bituminous class A coal.
Summary:
The mining schedule for the BIB concession blocks includes 4 existing open-cut mines, Kusan Girimulya (KG), Batulaki South (BS), Sebamban North (SN) and Sebamban South (SS) and a proposed open-cut mine at Pasopati (PP) with a target combined total coal production of 45 Mtpa from all the pits from the year 2023 onwards.
The mining operation in BIB is an open-pit mine using standard truck and excavator methods which are a common practice in Indonesia. Waste material is mined using hydraulic excavators and loaded into standard rear tipping off-highway trucks and hauled to dumps in close proximity to the pits or to in-pit dumps where possible. For the purpose of this Report, it is proposed that contractors will continue to be used for mining and haulage operations over the life of mine, and the unit costs used for the Reserve estimate reflect this style of mining.
All pits except for Pasopati block have been designed such that low walls commenced at the sub crops and followed the coal floors. The overall highwall batter angle approximately varies from 20 to 35 degrees as the ultimate pit depth ranges from a little more than 80 m to 200 m. This was done in accordance with the geotechnical study done on the KG Block.
In Pasopati, it was not possible to follow any seam floor at the lowwall side because of the block's steeply dipping stratigraphy. Hence a geotechnically stable batter angle was selected for this block and used for the pit design. As a consequence, this pit includes a significant amount of underburden material below the bottommost seam.
Source:
Summary:
The coal is to be sold unwashed so no processing factors have been applied. Other than crushing
to a 50 mm top size no other beneficiation will be applied.
Coal from Kusan Pit is being hauled (about 20 km) to Port Bunati (Seaport owned by GEAR) for export to customers.
Coal from BS Pit is hauled 16 km to the Port Abidin. Port Abidin is a river-based port where all the coal handling arrangements are being rented including loading onto the barges (7500-8000 tonne barges).
Presently at KG block, coal handling and infrastructure is already in place as coal mining activities are underway since 2011. The existing infrastructure at KG includes a run of mine (ROM) stockpile, a primary crushing and screening plant at the mine site.
At present, current operations use both the coal crushing plants located at ROM stockpile and at the port. Coal mined from the KG Block is currently hauled by using a recently completed expanded dedicated haul road. Th ........

Production:
Commodity | Units | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Coal (thermal)
|
Mt
| ...... ^ | ......  | ......  | 20 | 13 | 7.5 |
Sulfur | % | | 0.22 | | | | |
^ Guidance / Forecast.
- Subscription is required.
Reserves at December 31, 2020:
Category | Tonnage | Commodity |
Proven
|
588.7 Mt
|
Coal (thermal)
|
Probable
|
105.2 Mt
|
Coal (thermal)
|
Proven & Probable
|
693.9 Mt
|
Coal (thermal)
|
Measured
|
935 Mt
|
Coal (thermal)
|
Indicated
|
355 Mt
|
Coal (thermal)
|
Inferred
|
540 Mt
|
Coal (thermal)
|
Total Resource
|
1,830 Mt
|
Coal (thermal)
|
Operating Costs:
| Units | 2020 |
OP mining costs ($/t mined)
|
USD
| 0.75 |
OP mining costs ($/t processed)
|
USD
| ......  |
Total operating costs ($/t processed)
|
USD
| ......  |
- Subscription is required.
- Subscription is required.