Playa Verde (Copper Bay) Project

Click for more information

Categories

Summary

Mine TypeTailings
Study CompletedFeasibility
Study in ProgressFeasibility Update
StageFully Permitted
Commodities
  • Copper
  • Gold
Mining Method
  • Dredging
Mine Life... Lock
SnapshotChañaral Copper Project (previosly Copper Bay) is an advanced copper and associated gold tailings retreatment project located in the Chañaral Bay area. The resource consists of tailings, from inland copper mining operations, which were deposited in a dry riverbed (at that time) between 1938-1975 and which have over decades now washed down to the coast to be deposited in the bay and on the beach.

The Project development has been fully planned both financially and operationally in the DFS previously completed by the previous owners. In March 2025 the Project has obtained EIA approval. Guardian Metals is commissioning studies to update the DFS and completing a bankable feasibility study ahead of moving the Project into development and first revenues.

As at April 2025, Guardian Metals is conducting negotiations with funders to secure sufficient financial resources to complete an update of the definitive feasibility and associated studies.

Owners

SourceSource
CompanyInterestOwnership
Copper Bay Ltd. (operator) 100 % Indirect
Guardian Metals PLC 100 % Indirect
The Central Asia Metals (CAML) held a 76% stake in Copper Bay Limited (CBL), which through Chilean subsidiaries holds 100% of the Copper Bay project (now Playa Verde project).

On 9 April, 2025, CAML announces the completion of the sale of its 76.1% shareholding in CBL to Guardian Metals PLC (GMP). CBL, via its subsidiaries, holds the mineral rights to a copper tailings project in Chile.

GMP's acquisition of CAML's 76.1% shareholding has triggered compulsory 'drag' rights over the remaining 23.9% held by minority shareholders, and that interest has also been acquired by GMP.

GMP has agreed to pay an aggregate consideration, for 100% of CBL, of $7.5million to the sellers which will be satisfied in cash in two tranches of $3.75million each on the aggregate production of 7,500 tonnes and 15,000 tonnes of copper cathode and/or copper concentrate.

Deposit type

  • Tailings

Summary:

Between 1938 and 1975 the Potrerillos and later the El Salvador copper mines, disposed of tailings from their respective mineral processing operations into the Rio Salado which outflows into Chañaral Bay. Over that period, it is believed that some 250Mt of tailings were discharged into the bay. These tailings now sit in the bay and on the beach at Chañaral, covering an area of 13km2.

Tails accumulation ceased over 40 years ago, the beach and sub-sea environment has been weathered and winnowed by wave, chemical and wind action.

Significantly, much of the Copper Sulphide mineralisation has oxidised, especially in the upper parts of the deposit, making it amenable to leaching.

Tailings of up to 14m in thickness overlay the original beach, with a transition layer comprised of tailings mixed with original beach material.

Mineralisation reflects original Potrerillos and Salvador ore, albeit with significant amount of Cu and Mo removed and process chemicals added.

Principal copper-bearing minerals are chalcopyrite, bornite, covellite, chalcocite, malachite, chrysocolla and brochantite.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Copper Payable metal t 66,000
Gold Payable metal oz 9,600
Copper Metal in concentrate t 1,560
Copper Cathode t 7,080
Copper Total t 8,640

Operational metrics

Metrics
Daily processing rate 14,000 t *
Annual processing rate 5 Mt *
Ore tonnes mined, LOM 34.8 Mt *
* According to 2017 study.

Production Costs

CommodityUnitsAverage
C1 cash costs Copper USD 1.37 / lb *  
Assumed price Copper USD 3 / lb *  
* According to 2017 study / presentation.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
After-tax IRR, %  ......  Subscribe

Aerial view:

Lock

- subscription is required.