• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
South Africa
New Denmark Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
24 km NE from Standerton, South Africa

  Address:
Farm Slagkraal 353-IS District
Standerton
South Africa
2429
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in South Africa
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeUnderground
Commodities
  • Coal (thermal)
Mining Method
  • Longwall
  • Continuous
Production Start...
Mine Life2038


Owners

Source: p. 1,2
CompanyInterestOwnership
Seriti Resources Holdings Proprietary Ltd. 90 % Indirect
Seriti Resources Holdings Pty Ltd (‘Seriti’) is a broad based, 91% black owned and controlled South African mining company co- owned by four black anchor shareholders, Masimong Group, Thebe Investments, Zungu Investments (Zico) and Community Investment Holdings (CIH). Seriti Coal Community Employee, and Management Trusts own 10% of the Seriti Resources Holdings Pty Ltd.

Seriti, through its operating subsidiary, Seriti Coal Pty Ltd, operates three large- scale, opencast and underground thermal coal mines namely, New Vaal, New Denmark and Kriel Collieries.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sedimentary


Summary:

New Denmark Colliery reserves occur within the Vryheid Formation of the Ecca Group within the Karoo Sequence. Sixty boreholes have been drilled by the mine to the base of the Karoo Supergroup in the MRA from which geological information could be derived. The thickness of the sediments underlying the No. 4 coal seam varies between 50 and 300 m. The coal-bearing Ecca Group ranges in thickness from 125 - 360 m and is comprised of an upper shale-like stage, the Volksrust Shale Formation, the mainly sandy coal measure stage, the Vryheid Formation, and a locally developed lower silt to shale stage, the Pietermaritzburg Shale Formation. The Vryheid Formation sediments developed in the NDC area are similar to those occurring elsewhere in the Highveld and Witbank Coalfields and are comprised mainly of sandstone, with lesser amounts of sandstone / siltstone and mudstone.

New Denmark is mined the No. 4 Seam. The No. 4 Seam is comparatively narrow at an average height of 1.8 m, being as low as 1.6 m in places.


Mining Methods

  • Longwall
  • Continuous


Summary:

Only underground mining methods are employed. The coal seam is accessed by means of three shaft systems (Central Shaft, North Shaft and Okhozini Shaft). The following underground mining methods are presently employed and are envisaged to continue until the end of the life of the mine.

Continuous miner mechanised mining is used to develop the bord and pillar primary, secondary and tertiary developments. The coal seam is mined to its full thickness. This method of development was selected on the grounds of productivity, requiring less equipment and less manpower than conventional mechanisation. The primary development is the main development on the mine. It offers primary access to the coal seam. The number of roadways is determined by the ventilation requirements. The centre set of roadways carry intake air and is flanked by two further sets of roadways, that carry return air. The secondary development is developed off the primary access to give access to mining reserve blocks. These developments also consist of central intake airways flanked by two return airways that are separated by a solid pillar. The number of roadways is also determined by the ventilation requirements.

The tertiary development is developed off the secondary developments to give access to each individual block. The number of roadways is also dependent on the ventilation requirements. Three road chain developments are developed off the tertiary developments to allow access to the tota ........


Crushing and Grinding
Source: Subscription required


Processing


Summary:

The coal processing plant is basically comprised of the Crusher Plant. The Crusher Plant is located between the North and Central Shaft areas and adjacent to the Coal Stockyard.

In order to meet the more stringent coal quality requirements of Eskom, NDC proposes to construct a De-Stoning Plant adjacent to the existing Crusher Plant.


Production:
New Denmark mine was acquired from Anglo American in March 2018 by Seriti Resources Holdings Proprietary Ltd.

2018 full year production numbers have not been reported.

CommodityUnits2020 *20192017201620152014
Coal (thermal) Mt  ......  Subscription required *  ......  Subscription required3.42.52.83.8
All production numbers are expressed as ROM coal. * Average annual production reported in 2020
Subscription required - Subscription is required.

Operational Metrics:

Metrics2019201720162015
Coal tonnes mined 3,617,000 t of ROM coal3,361,000 t of ROM coal2,547,400 t of ROM coal2,838,300 t of ROM coal

Reserves at December 31, 2017:

CategoryTonnage Commodity
Proven 44.3 Mt Coal (thermal)
Probable 51.4 Mt Coal (thermal)
Proven & Probable 95.7 Mt Coal (thermal)
Measured & Indicated 80.5 Mt Coal (thermal)



Heavy Mobile Equipment as of August 11, 2021:
HME TypeQuantity
Continuous Miner ....................... Subscription required
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 4, 2022
....................... Subscription required ....................... Subscription required Subscription required Aug 4, 2022
Subscription required - Subscription is required.

Staff:

EmployeesContractorsTotal WorkforceYear
Subscription required Subscription required Subscription required 2021
Subscription required Subscription required Subscription required 2020
Subscription required Subscription required Subscription required 2019
Subscription required Subscription required Subscription required 2018
Subscription required Subscription required Subscription required 2017

Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
Annual Report 2017
Year-end Mineral Reserves 2017
Annual Report 2016
Other 2016
Year-end Mineral Reserves 2016
Annual Report 2015
Other 2015
Year-end Mineral Reserves 2015
Other 2014
Other 2013
Other 2010
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.