Cooper Ridge UG Mine (Central Appalachia Operation)

This page is not tailored to
devices with screen width under 750 px.
 Location:
63 km N from Knoxville, Tennessee, United States

  Regional Office:
144E Market Place Blvd
Knoxville
Tennessee, United States
37922
Phone  ...  Subscription required
EmailEmail
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in United States
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StatusTemporary Suspension
Mine TypeUnderground
Commodities
  • Coal (thermal)
Mining Method
  • Continuous
Processing
  • Wash plant
  • Wet Screening
Mine Life2029
MSHA status was changed to NonProdActive on March 28, 2020


Owners & OPERATOR

Source: p. 1
CompanyInterestOwnership
Kopper Glo Mining, LLC. (operator) 100 % Direct
Industrial Minerals Group, LLC 100 % Indirect

Deposit Type

  • Sedimentary


Summary:

The Property is situated in the southern portion of the Appalachian Basin, which contains two-fifths of the nations’ bituminous coal deposits and extends over 900 miles from northern Alabama to Pennsylvania.

The primary coal-bearing formations on the Property are Carboniferous in age, being in the Pennsylvanian system, which includes the Breathitt Formation. The average mineable seam thickness for coal horizons in these formations ranges from 1 foot to over 6 feet. The coal seams are generally continuous and non-complex but may vary in thickness and may also be locally absent. Seams retain normal stratigraphic sequence throughout the Property and no evidence has been observed that seams have been modified from pre-deformational thicknesses.

Mineable coal seams within the Property are typically low-ash with the exception of the Joyner seam, and highthermal content bituminous coals. The maximum seam thic ness may reach over 6.0 feet in the Upper Jellico underground mines; however, the average mineable thickness of the seams in this evaluation generally ranges from 1 foot to 4 feet. Seams are generally continuous, but may be locally absent. Secondary discontinuity due to erosional features is present in most areas, resulting in seam outcropping, or visible exposure of the seam at the surface. Other than oxidation of the coal exposed at the surface, erosion of the seams has no significant impact on the mineralized deposits. All seams outcrop on the property, with the exception of the Cumberland Gap seam, which is below drainage. Coal seams are characterized by both single bench and multiple-bench coal horizons with parting (non-coal) material varying by seam and area. Seam parting is common within the coal seams on the Property with intra-seam parting material increasing drastically in some areas. Roof strata are typically shale or sandy shale with zones of sandstone roof being common. Floor strata are typically sandstone, shale, sandy shale, or fireclay.


Mining Methods

  • Continuous


Summary:

The proposed Cooper Ridge Mine is located on Straight Creek. The Jellico seam is accessed via drift entry. Cooper Ridge is a thermal coal operation on the WPP lease.

Production is scheduled for 255 days each year, which represents production on Monday through Friday and occasional Saturdays and idle holidays. On each day, up to four production sections are scheduled to produce coal on two shifts; the third shift is reserved for maintenance and mine conveyor belt and power moves. In 2018, only one section, which comes from Double Mountain, will be operating at Cooper Ridge. After completion of operations at Double Mountain, a second section will begin operating at Cooper Ridge in 2019, a third section will be added in 2020, and a fourth section will be added in 2021 after completion of operations at Ben’s Branch. The sections are configured with one continuous miner available for production in each section.

Principal production equipment for each section includes a continuous miner, two roof bolters, three shuttle cars, and two scoops. Coal is extracted from the production face with the continuous miner and hauled to the mine conveyor in shuttle cars. At the conveyor belt, the coal is discharged from the shuttle cars onto a feeder breaker for transfer onto the conveyor. The conveyors carry the coal to the outside, where it is stacked on the ground to await truck transport to the Kopper Glo coal preparation plant and load-out. The truck haul distance is approximately 3 miles.


Crushing and Grinding


Processing

  • Wash plant
  • Wet Screening

Source: Subscription required

Summary:

All underground mine and highwall mining production will be washed at the Kopper Glo coal preparation facilities.

Coal is transported to the coal preparation plant and load-out facilities by coal trucks and conveyor belts.

Raw coal is fed directly into the coal preparation plant via a truck dump. Stockpile capacity includes approximately 20,000 tons of raw coal storage and 40,000 tons of clean coal storage at the plant.

The Kopper Glo Coal Preparation Plant is designed for 350 tons per hour (tph) raw coal feed. Raw coal is screened to provide sized material to each of three cleaning circuits.

Clean coal and refuse products are dewatered with vibratory screens, sieve screens, and centrifugal dryers. The thickener underflow is concentrated by belt presses and is transported to the combined refuse disposal facility by conveyor belt. The combined refuse disposal facility, located approximately 1.2 miles southwest of the plant on the Rock Creek, ........


Production:

CommodityUnits20192018201720162015
Coal (thermal) tons  ......  Subscription required  ......  Subscription required105,75450,84713,143
All production numbers are expressed as clean coal.
Subscription required - Subscription is required.


Reserves at October 31, 2016:

CategoryTonnage Commodity
Proven & Probable 4,065 k tons Coal (thermal)


Proposed Heavy Mobile Equipment as of December 31, 2016:
HME TypeQuantity
Continuous miner 1
....................... Subscription required 2
....................... Subscription required 2
Subscription required - Subscription is required.

Mine Management:

Job TitleNameEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 21, 2020
....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Aug 21, 2020
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2019
Subscription required 2018
Subscription required 2017
Subscription required 2016
Subscription required 2015

Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2018
Annual Information Form 2016
Corporate Presentation 2016
Financial Review 2016
Technical Report 2016
Technical Report 2014
Subscription required - Subscription is required.