• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Brazil
Germano (Samarco) Complex (Mariana Complex)

This page is not tailored to
devices with screen width under 750 px.
 Location:
20 km NW from Mariana, Brazil

  Address:
Rodovia MG-129, km 117,5, s/n Caixa Postal 22
Mariana
Brazil
35420-000
Phone  ...  Subscription required
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Brazil
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life2042
Samarco Mineração owns Germano operations (comprises the Alegria mines), in the cities of Mariana and Ouro Preto (MG), where Samarco extracts and processes the ore; and Ubu (Anchieta - ES), where Samarco maintains industrial (pelletizing) and port activities.

After five years of suspended operations due to the failure of the Fundão dam, Samarco resumed operations at the Germano complex and the Ubu unit in December 2020.


Owners

Source: p. 28,57,237
CompanyInterestOwnershipInvestor's Info
Vale S.A. 50 % Indirect
BHP Group Ltd. 50 % Indirect
Samarco Mineracao S.A. (operator) 100 % Direct
BHP Brasil 50% of Samarco Mineração S.A. Vale S.A. 50%. Samarco is operated independently by Samarco Mineração S.A.

Samarco is a non-operated joint venture (NOJV) owned by BHP Billiton Brasil Ltda (BHP Brasil) and Vale S.A. (Vale), with each having a 50 per cent shareholding.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Banded iron formation


Summary:

Itabirite ore type.

Samarco’s Alegria mine complex and Germano mine, located in Mariana, Minas Gerais, is in the same region as Vale's Southeastern System - Quadrilatero Femfero (Iron Quadrangle).

Ore reserves with high ratios of itabirite ore relative to hematite ore type. Itabirite ore has iron grade of 35-60%.

The Quadrilátero Ferrífero (QF) comprises an area of about 7000 km2 and hosts one of the largest concentrations of lateritic iron-ore deposits in the world. The QF is located in central Minas Gerais state, southeastern region of Brazil (Dorr, 1965). The QF has a quadrangular shape due to the dome and basin structures of the Minas Supergroup. Most of the iron ore in the QF are hosted in the oxidized, metamorphosed and heterogeneously deformed Banded Iron Formations (BIFs) of the Cauê Formation, the so-called itabirites. The BIFs are altered sedimentary deposits with laminated rocks formed by alternating layers of silica and hematite magnetite, as well as carbonates and iron silicates.

The Quadrilátero Ferrífero is located at the southeastern border of the São Francisco Craton, southeastern Brazil. According to Alkmim and Marshak (1998) the most important lithostratigraphic units of the Quadrilátero Ferrífero are: (1) the Archean crystalline basement, (2) the Rio das Velhas Supergroup, (3) the Minas Supergroup, (4) the Post-Minas Intrusives and (5) the Itacolomi Group.

Basement crystalline rocks include a gneiss/ ........


Mining Methods

  • Truck & Shovel / Loader


Summary:

Open-cut mining operations.


Crushing and Grinding


Processing

Source: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits202320222021
Iron Ore Mt  ......  Subscription required ^  ......  Subscription required  ......  Subscription required
All production numbers are expressed as pellets. ^ Guidance / Forecast.

Operational Metrics:

Metrics202220202019
Annual production capacity  ......  Subscription required  ......  Subscription required8 Mt of iron ore pellets
Ore tonnes mined  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required.

Reserves at June 30, 2022:
Cut-off grade was 22%Fe.

CategoryTonnage CommodityGrade
Measured 3,150 Mt Iron 39.3 %
Indicated 1,880 Mt Iron 37.6 %
Inferred 600 Mt Iron 37.2 %
Total Resource 5,630 Mt Iron 38.5 %

Financials:

Units2022202120202019201820172016
Revenue M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 30   28   937  
Operating Income M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required -1,558   -1,520   -2,182  
Subscription required - Subscription is required


Pipelines
Source: Subscription required


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 15, 2023
....................... Subscription required ....................... Subscription required Subscription required Mar 15, 2023
....................... Subscription required ....................... Subscription required Subscription required Mar 15, 2023
....................... Subscription required ....................... Subscription required Subscription required Mar 15, 2023
Subscription required - Subscription is required.

Staff:

EmployeesContractorsTotal WorkforceYear
Subscription required Subscription required Subscription required 2021
Subscription required Subscription required Subscription required 2020
Subscription required Subscription required Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
Annual Report 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
Annual Report 2018
Form 20-F 2018
Annual Report 2017
Annual Report 2017
Annual Report 2016
Form 20-F 2016
Annual Report 2015
Form 20-F 2015
Form 20-F 2015
Form 20-F 2014
Other 2014
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.