Mining Intelligence and News
Brazil

Taquari-Vassouras Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Potash
Mining Method
  • Room-and-pillar
  • Continuous
Production Start... Lock
Mine Life... Lock
SnapshotThe Mosaic Company conducts its potash operations through the leased Taquari-Vassouras shaft mine, which is the only potash mine in Brazil. The Company also owns a related refinery at the site and produce and sell potash product domestically. MOP is the primary source of potassium for the crop nutrient industry in Brazil. Red MOP has traces of iron oxide. The granular and standard grade red MOP products are well-suited for direct fertilizer application and bulk blending.

Owners

SourceSource
CompanyInterestOwnership
The Mosaic Company 100 % Indirect
Mosaic Fertilizantes P&K S.A. (operator) 100 % Direct
100% owned by Mosaic Potássio Mineração Ltda, a wholly owned indirect subsidiary of Mosaic.

Deposit type

  • Evaporite

Summary:

The deposit is in the Taquari-Vassouras sub-basin and is a bedded evaporite.

The Taquari-Vassouras mine is located near Aracaju (Sergipe state) in north-east part of Brazil. The stratigraphic column of the Taquari-Vassouras sub-basin consists, from the base up to the top, of sediments of age varying from the lower Cretaceous (Aptian) to the Terciary, that overlie discordantly the crystalline basement. The potash deposit is found at a depth of 450–500 m in the Ibura Evaporites which consist, from the bottom up, of limestones, anhydrites, halites, carnalites, tachydrites, with interspersed shales, halites with seams of silvinite, calcilutites (clayey fine-grain limestones) and shales. There are two main potash zones, the Upper Basal Silvinite and the Lower Basal Silvinite.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits20202019201820162015
All production numbers are expressed as MOP.

Operational metrics

Metrics202320222021202020192018
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe520,000 t of potash MOP520,000 t of potash MOP
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.8 Mt

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Apr 24, 2024
....................... Subscription required ....................... Subscription required Subscription required Apr 24, 2024

Aerial view:

Lock

- subscription is required.