Mining Intelligence and News
Australia

South Walker Creek Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (metallurgical)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start... Lock
Mine Life... Lock
SnapshotSouth Walker Creek PCI is one of the highest performing PCI products in a steel blast furnace given its low volatility matter.

Expansion to 9.4Mtpa of ROM Coal and 7.0 Mtpa saleable production is expected between mid-2024 and early 2025. All approvals are in place and the commencing of work is on track with encouraging tender outcomes for the mining services contract, CHPP upgrade and MIA infrastructure works.

MRA2C Project is Fully permitted project provides access ROM with lower strip ratios, higher yields and shorter hauls. MRA2C has commenced with scheduled for first coal in early 2025.

Owners

SourceSource
CompanyInterestOwnership
Golden Energy and Resources Ltd. (GEAR) 64.01 % Indirect
Stanmore SMC Pty Ltd. (operator) 100 % Direct
Stanmore Resources Limited is a 64.01% indirect subsidiary of Golden Energy and Resources Limited, and owns South Walker Creek mine.

On October 7, 2022, Stanmore Resources Limited completed the acquisition of the remaining 20% interest in BHP Mitsui Coal Pty Ltd, now renamed Stanmore SMC Pty Ltd (SMC). Following the completion of the Acquisition, Stanmore owns 100% of SMC.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The South Walker Creek (SWC) deposit is situated within the Nebo Synclinorium on the eastern flank of the Carborough Syncline. Permian coal measures dip westerly at five to ten degrees, with dips steepening in the north in the Kemmis deposit. Locally the principal economic seam is the Main Seam, which splits to the north and south into Main Tops and Main Bottoms. The Main Seam is believed to be equivalent with the Elphinstone Seam (Leichardt) and upper part of the Hynds Seam, and extends over two kilometres in strike length in the south, comprising 10.5 to 14m of mainly dull to dull banded coal with minor mudstone partings. The Hynds Seam in South Walker has deteriorated to a sub-economic banded seam and displays seam splitting relationships present at South Walker Creek.

The Hynds Seam consists of three components: two coal seams (Upper & Lower); and the Yarrabee Tuff, and is equivalent to the Vermont seam, mined at the Poitrel Deposit. The Hynds Seam lies between 15 and 60 metres below the main seams, at an average of 32 metres, and varies in thickness across the deposit and tends to be heavily stone banded.

The Hynds Upper (HT) split is generally thin (one to two metres) and contains few stone bands. Underlying Yarrabee Tuff is commonly altered to clay and tends to be soft and puggy in nature with an average thickness of 0.5 metres and is problematic for coal washing if mined. Hynds Lower Seam (HB) tends to be substantially thicker (two to nine metres) than the upper seam, but contains multiple stone bands. The Hynds seam is only occasionally intersected, not because it is not present, but due to a lack of drill holes of sufficient depth.

Dimensions
Resources in the Main Seam occur from the southern boundary to the northern boundary of ML4750. The subcrop length in ML4750 of the Main Seam is 42 km length. At the widest point of the leasehold, the Main Seam extends for 5.2 km from subcrop to the edge of the lease boundary. In the narrow very northern part of the lease, the subcrop to lease boundary distance is ~580 m.

Resources contained in the Hynds seam are confined to the northern part of the deposit, where it extends over two distinct areas, 3.2 and 2.4 km length.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Production numbers of 6 million tonnes of clean coal have been calculated on the basis of 4.0 million tonnes of production for the period 1 May 2022 to 31 December 2022 (due to the transfer of ownership of South Walker Creek to Stanmore).

Production numbers of 8.1 million tonnes of coal mined have been calculated on the basis of 5.4 million tonnes of coal mined for the period 1 May 2022 to 31 December 2022 (due to the transfer of ownership of South Walker Creek to Stanmore).
CommodityUnits202320222021202020192018201720162015
Coal (metallurgical) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe6.265.15.45.3
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics2022202120202019201820172016
Coal tonnes mined  ....  Subscribe
Hourly processing capacity  ....  Subscribe
Annual production capacity  ....  Subscribe
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe7,729,459 t of ROM coal8,108,267 t of ROM coal7,375,485 t of ROM coal7,174,153 t of ROM coal
Plant annual capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe8,053,609 t8,377,813 t7,013,840 t7,109,632 t

Production Costs

CommodityUnits2022
Cash costs (sold) Coal (metallurgical) USD  ....  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 12, 2023

Aerial view:

Lock

- subscription is required.