Mining Intelligence and News
Brazil

Pedra de Ferro (BAMIN) Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusCare and Maintenance
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotBAMIN Operation consists of the Pedra de Ferro iron ore mine, the FIOL railway and the Porto Sul port development. It represents one of the largest infrastructure development projects in Brazil, with a planned production of 26 million tonnes of iron ore.

In 2023, ERG started the construction of FIOL 1. FIOL 1 is the first section of Brazil’s major West-East Integration Railway (FIOL) project. This will (as part of the broader FIOL project) carry ore from the Pedra de Ferro mine to the east coast of Brazil for export via Porto Sul.

Bamin intends to propose to the Ministry of Transport a new forecast for the start of Fiol’s operations, rescheduling the previous 2027 target to 2031.

As at Oct 2025, the Pedra de Ferro mine has been under care and maintenance since Jan 2025, with a capacity to produce up to 2Mtpa of high-grade iron ore. The goal is to significantly increase production after completing the logistics corridor that will connect Bahia’s interior to the coast.

Owners

SourceSource
CompanyInterestOwnership
Eurasian Resources Group S.a r.l. 100 % Indirect
Bahia Mineracao S.A. (operator) 100 % Direct
The operation is 100% owned by Bahia Mineração(BAMIN), a wholly-owned Brazilian subsidiary of ERG(Eurasian Resources Group).

Bamin reported at the opening of Exposibram that its shareholders are reviewing proposals from strategic investors for the integrated project encompassing the Pedra de Ferro mine, the FIOL railway and Porto Sul in Ilhéus (BA). A selection decision is expected by early 2026, when one proposal will be chosen to proceed to negotiations.

Contractors

Lock

- subscription is required.

Deposit type

  • Banded iron formation

Summary:

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Water usage

Parameter2022
Groundwater 537.2 ML
Surface water 36.2 ML

Commodity Production

CommodityProductUnits202320222021
Iron Ore Fines Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe
Iron kt  ....  Subscribe  ....  Subscribe

Operational metrics

Metrics20232022
Annual production capacity  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Mine Financials

Units20222021
Revenue M BRL  ....  Subscribe  ....  Subscribe
After-tax Income M BRL  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required 2021

Aerial view:

Lock

- subscription is required.