Australia
Jack Hills Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
140 km W from Geraldton, Western Australia, Australia

  Project Contacts:
7 Rheola Street
West Perth
Western Australia, Australia
Phone  ...  Subscription required
Fax+61 8 9226 3388
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StatusCare and Maintenance
Mine TypeOpen Pit
Commodities
  • Iron (hematite)
Mining Method
  • Truck & Shovel / Loader
Processing
  • Gravity separation
  • Flotation
  • Magnetic separation
Mine Life39 years (as of Jan 1, 2011)


Owners

 
CompanyInterestOwnership
Sinosteel Midwest Corporation Ltd. 100 % Direct

Deposit Type

  • Banded iron formation


Summary:

The Jack Hills Resource comprises banded iron formation (BIF-BFO) of 2,870 Mt at 30.7 % Fe, Massive Iron Mineralisation (MIM), Direct Shipping material (MIM-DSO) of 133 Mt at 56.2 % Fe, Massive Iron Mineralisation potential Jig Feed or BFO (MIM-JIG) of 96 Mt at 45.5 % Fe and Detrital Iron Deposits (DID) which includes potential BFO, Jig feed canga or colluvium deposits of 118 Mt at 32.6 % Fe.


Mining Methods

  • Truck & Shovel / Loader


Summary:

Conventional large-scale truck and shovel mining method.

The JHEP mine plan, which has a projected life of 39 years, envisages a high-volume strip mining method utilising large-scale mining fleet at multiple working faces to produce a consistent quality of ore feed for the processing plant, with an average life of mine strip ratio of approximately 0.94:1.


Crushing and Grinding


Processing

  • Gravity separation
  • Flotation
  • Magnetic separation

Source: Subscription required

Summary:

The plant design incorporates established equipment and processing technologies used domestically and internationally within the iron ore and other extractive industries.

Each concentrator module will utilise conventional low-intensity magnetic separation to produce a premium magnetite pellet feed concentrate and a gravity / flotation circuit to produce a high quality hematite sinter feed concentrate. Pilot testing of the flowsheet achieved total iron recovery of 74.8%.


Projected Production:

CommodityProductUnitsLOM
Iron (hematite) Ore M wmt 14
Iron (hematite) Concentrate M wmt 701

Operational Metrics:

Metrics2011
Stripping / waste ratio 0.94
Annual mining capacity 120 Mt
Annual processing capacity 55 Mt

Reserves at December 31, 2011:

CategoryTonnage CommodityGrade
Measured 906 Mt Iron (hematite) 32.4 %
Indicated 1,267 Mt Iron (hematite) 32.2 %
Inferred 1,061 Mt Iron (hematite) 32.3 %

Operating Costs:

Units2020
OP mining costs ($/t mined) AUD 6.25 *
Processing costs ($/t milled) AUD  ......  Subscription required
Total operating costs ($/t milled) AUD  ......  Subscription required
* According to 2011 study.
Subscription required - Subscription is required.

2011 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscription required
Total CapEx $M AUD  ......  Subscription required
Processing OpEx $M AUD 0.9
Subscription required - Subscription is required.

Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 7, 2018
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2011
Technical Report 2011