• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
United States
Slabcamp (CAPP Thermal) Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
10 km NE from Glasgow, West Virginia, United States

  Address:
340 Martin Luther King Jr. Blvd.
Bristol
Tennessee, United States
37620
Phone  ...  Subscription required
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in United States
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeUnderground
Commodities
  • Coal (thermal)
Mining Method
  • Room-and-pillar
Production Start...
Mine Life2023
CAPP - Thermal consists of one active mine and one preparation plant in West Virginia.

Alpha’s last remaining thermal operation, the Slabcamp mine, is on schedule to mine out and cease operation in summer of 2022. But the radically changing economics in the thermal market have also increased the reserve life at our Slabcamp deep mine. Formerly planned to idle in 2022 year, more resource tons have been identified and mine plans are being developed. The company's last pure-play thermal mine is now expected to operate into the first quarter of 2023 year.


Owners

Source: p. 56
CompanyInterestOwnership
Alpha Metallurgical Resources, Inc. 100 % Indirect

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sedimentary


Summary:

Company operate high-quality, cost-competitive coal mines across the Central Appalachia (“CAPP”) coal basin.


Mining Methods

  • Room-and-pillar


Summary:

Room-and-Pillar Mining
Certain company mines in CAPP use room-and-pillar mining methods. In this type of mining, main airways and transportation entries are developed and maintained while remote-controlled continuous miners extract coal from the seam, leaving pillars to support the roof. Shuttle cars or battery coal haulers are used to transport coal from the continuous miner to the conveyor belt for transport to the surface. This method is more flexible than longwall mining and often used to mine smaller coal blocks or thinner seams of coal. Ultimate seam recovery of in-place reserves is less than that achieved with longwall mining. All of this production is also processed in preparation plants to remove rock and impurities before it becomes saleable clean coal.


Crushing and Grinding


Processing

Source: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits20212020201920182017
Coal (thermal) tons  ......  Subscription required  ......  Subscription required  ......  Subscription required1,070,5111,197,819
Subscription required - Subscription is required.


Reserves at December 31, 2020:

CategoryTonnage Commodity
Proven 533 k tons Coal (thermal)
Probable 3,911 k tons Coal (thermal)
Proven & Probable 4,444 k tons Coal (thermal)



Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 14, 2022
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2021
Subscription required 2020
Subscription required 2019
Subscription required 2018
Subscription required 2017

Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.