Overview
Stage | Production |
Mine Type | Open Pit & Underground |
Commodities |
|
Mining Method |
- Airleg stoping
- Truck & Shovel / Loader
- Longhole open stoping
- Room-and-pillar
- Cemented backfill
- Paste backfill
|
Production Start | ...  |
Mine Life | 2037 |
Previously, the King of the Hills ore was being treated at Red 5’s Darlot processing plant, which was placed into care and maintenance in July 2022.
In 2022, Red 5 has established the new King of the Hills Processing Hub.
The King of the Hills (KOTH) Gold Mine now comprises a centralised 5.5Mtpa processing hub, which is fed by three mines: 1. KOTH Open Pit 2. KOTH Underground 3. Darlot Underground, a satellite mine 100 kilometers north of KOTH.
Since FY 2023 mine's production and financial results of Darlot mine have been included into the King of the Hills mine. |
Source:
p. 2,84
Company | Interest | Ownership |
Red 5 Ltd.
|
100 %
|
Indirect
|
Red 5 owns and operates the new long-life King of the Hills (KOTH) Gold Mine. The KOTH Gold Mine comprises a centralised 5.5Mtpa processing hub, which is fed by three mines: KOTH Open Pit, KOTH Underground, Darlot Underground, a satellite mine 100 kilometeres north of KOTH.
The King of the Hills are 100% held and managed by Greenstone Resources (WA) Pty Limited, a wholly owned subsidiary of Red 5 Limited.
The Darlot mine is operated through Red 5’s 100%-owned subsidiary company, Darlot Mining Company Pty Ltd.
Contractors
- Subscription is required.
Deposit Type
- Vein / narrow vein
- Breccia pipe / Stockwork
Summary:
King of the Hills (KOTH) mine
The King of the Hills (KOTH) mineralisation is considered to be part of an Archean Orogenic gold deposit with many similar characteristics to other gold deposits within the Eastern Goldfields of the Yilgarn Craton.
Gold mineralisation is associated with sheeted and stockwork quartz vein sets within a hosting granodiorite stock and pervasively carbonate altered ultramafic rocks. Mineralisation is thought to have occurred within a brittle/ductile shear zone with the main thrust shear zone forming the primary conduit for the mineralising fluids. Pre-existing quartz veining and brittle fracturing of the granite created a network of second order conduits for mineralising fluids.
Brittle fracturing along the granodiorite contact generated radial tension veins, perpendicular to the orientation of the granodiorite, and zones of quartz stockwork. These stockwork zones are seen in both the granodiorite and ultramafic units and contain mineralisation outside the modelled continuous vein system (High Grade Veins).
Gold appears as free particles (coarse gold) or associated with traces of base metals sulphides (galena, chalcopyrite, pyrite) intergrown within quartz along late stage fractures.
Dimensions
The northern section of the mineralised zone (also known as part of the Western Flank) strikes 30 degrees west of true north over a distance of 700m and plunges to the southwest. Individual lodes dip east at ........

Mining Methods
- Airleg stoping
- Truck & Shovel / Loader
- Longhole open stoping
- Room-and-pillar
- Cemented backfill
- Paste backfill
Summary:
The KOTH Gold Mine comprises a centralised 5.5Mtpa processing hub, which is fed by three mines: KOTH Open Pit, KOTH Underground, Darlot Underground, a satellite mine 100 kilometeres north of KOTH.
The 2023 financial year has seen Red 5 complete the ramp-up of production at our King of the Hills (KOTH) gold mine, with commercial production being declared on 16 December 2022.
KOTH Underground
The mining methods for underground is a mix of narrow to large scale open stoping and air leg room and pillar. Ore development is conducted by Jumbo with an average height of 5.0m and width of 5.0m. The KOTH decline is 5.8m high x 5.0m wide.
KOTH is currently an operating underground gold mine, and the KOTH Feasibility Study 2020 is predicated on the continuation of existing underground mining practices. Mine design parameters are based on current site guidelines, which are well understood and have been successfully implemented.
The proposed primary mining method is long-hole open stoping, with minor amounts of airleg stoping in flat dipping areas of the orebody (<1% of ore tonnes). Stoping will follow a top-down sequence, commencing at the extremities of each level and retreating to the level access. Rib pillars will remain between adjacent stopes to maintain mine stability. The proposed mining methods and sequence are generally a continuation of current operating practices at an increased production rate.
Areas identified for lo ........

Source:
p. 28,30
Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Reserves at June 30, 2023:
Mineral Resources:
KOTH OP cut-off at 0.4g/t was determined based on the estimated grade cut-off for a large-scale open pit mine. Mineral Resources KOTH UG cut-off at 1.0g/t determined based on estimated grade cut-off for large-scale open stoping.
Cut-off grades for the Underground Darlot - 2.0 g/t Au; the Underground Great Western - 1.5 g/t Au; the Open-pit Darlot and Great Western - 0.5 g/t Au.
Ore Reserves:
The cut-off grades for the KOTH OP are 0.4g/t Au, the KOTH UG are 1.3g/t Au, and Regional Reserves are 0.4g/t Au.
Darlot the cut-off grade for production is 2.4g/t, and for development, it is 1.0g/t.
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven & Probable
|
70,861 kt
|
Gold
|
1.1 g/t
|
2,578 koz
|
Total Resource
|
113,112 kt
|
Gold
|
1.7 g/t
|
6,242 koz
|
Commodity Production Costs:
| Commodity | Units | 2016 |
Cash costs
|
Gold
|
AUD
|
893 / oz†
|
All-in sustaining costs (AISC)
|
Gold
|
AUD
|
964 / oz†
|
^ Guidance / Forecast.
† Net of By-Product.
Financials:
| Units | 2023 | 2016 |
Capital expenditures (planned)
|
M AUD
| |
|
Revenue
|
M AUD
| ......  |
14
|
Pre-tax Income
|
M AUD
| ......  |
|
- Subscription is required
Source:

- subscription is required.
HME Type | Model | Size | Quantity | Status | Leased or Contractor | Ref. Date |
Drill (long hole)
|
.......................
|
|
.......................
|
Proposed
|
|
Sep 15, 2020
|
Drill jumbo (two boom)
|
.......................
|
|
.......................
|
Existing
|
|
Dec 24, 2022
|
Excavator
|
|
260 t
|
.......................
|
Existing
|
|
Dec 24, 2022
|
.......................
|
.......................
|
.......................
|
.......................
|
Proposed
|
|
Feb 3, 2022
|
Excavator
|
.......................
|
360 t
|
.......................
|
Existing
|
|
Feb 3, 2022
|
.......................
|
|
|
.......................
|
Proposed
|
|
Sep 15, 2020
|
.......................
|
.......................
|
|
.......................
|
Proposed
|
|
Sep 15, 2020
|
Truck (haul)
|
|
|
.......................
|
Existing
|
|
Dec 24, 2022
|
Truck (haul)
|
.......................
|
|
.......................
|
Existing
|
|
Feb 3, 2022
|
Truck (haul)
|
.......................
|
|
.......................
|
Existing
|
|
Dec 24, 2022
|
.......................
|
.......................
|
|
.......................
|
Proposed
|
|
Dec 24, 2022
|
- Subscription is required.
Mine Management:
Job Title | Name | Phone | Email | Profile | Ref. Date |
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Sep 15, 2020
|
.......................
|
.......................
|
|
|
|
Sep 15, 2020
|
.......................
|
.......................
|
|
|
|
Sep 15, 2020
|
.......................
|
.......................
|
.......................
|
.......................
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
.......................
|
.......................
|
|
|
|
Nov 17, 2023
|
- Subscription is required.
Staff:
Employees | Total Workforce | Year |
|
|
2023
|
|
|
2021
|
|
|
2020
|
|
|
2019
|
|
|
2018
|
|
|
2017
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.