Mining Intelligence and News
Australia

North Queensland Copper Operation

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Copper
  • Gold
  • Silver
Mining Method
  • Longhole open stoping
  • Avoca
  • Bench & Fill
Production Start... Lock
Mine Life... Lock
SnapshotNorth Queensland Copper Operations is comprised of the Mt Colin copper mine, the Barbara copper/gold project and a prospective tenement package in the Mount Isa/Cloncurry region. It was acquired by Aeris Resources in July 2022.

Mt Colin operated originally as an open-cut mine and then transitioned to underground operations in 2019.

With production at Mt Colin due to be complete in FY2024. Mt Colin employs long hole open stoping methods with run of mine ore crushed on site before being transported by road train to existing processing facilities in the region for toll treatment. The copper-gold concentrate produced is smelted in Mount Isa before being railed to the Port of Townsville for export.
Related Asset

Owners

SourceSource
CompanyInterestOwnership
Aeris Resources Ltd. 100 % Indirect
The North Queensland Copper Operations were acquired in July 2022 through the acquisition of Round Oak Minerals Limited.

Contractors

Lock

- subscription is required.

Deposit type

  • ISCG

Summary:

North Queensland Operations includes three deposits, Mt Colin, Barbara and Lillymay. The deposit is considered an ISCG (iron sulphide copper gold) classification. Mt Colin The deposit strikes approximately 295o (MGA), and dips approximately 75o NNE. It is hosted by metasomatised calc-silicates of the Corella Formation (1750-1738Ma), at surface, and by the Wonga-suite Burstall Granite (1745-1726Ma) at depth. Mineralisation principally controlled and essentially contained within the WNW-ESE striking planar Mt Colin fault. The broad-scale geology appears relatively simple and straightforward. The mineralised zone is dominated by pyrrhotite gangue to the east, and carbonate dominated gangue to the west. Known extent of +1.5% Cu mineralisation is approximately 400m in strike length, 500m down-dip, and up to ~10m in true width. The Mineral Resource extends to these limits. Barbara The deposit can be broken into main areas North, Central and South. Southern Lode of Barbara mineralization (+0.5% Cu) extends for approximately 230m in strike length (local N-S), averaging approximately 15m in true width (between 1m to >25m). As modelled it extends at least 580m down-plunge (550m below surface). The Mid and Northern Lodes average 3-5m in width over a combined strike length of 400m and to 180m below surface. Lillymay The Inferred Resource outcrops at surface and has been defined over a strike length of 400m, and down-dip for 140m. The larger E Lode is approximately 250m in strike length, separated from the 100m W lode by a 50m sub-grade zone. Resource widths vary from <1m to ~5m in true width.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

12 months to 30 June 2022 (previous Owner had a reporting period to 31 July).
CommodityProductUnits2024202320222021
Copper Metal in concentrate t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Gold Metal in concentrate oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Concentrate kt  ....  Subscribe
Silver Metal in concentrate oz  ....  Subscribe
^ Guidance / Forecast.

Operational metrics

Metrics20232021
Ore tonnes mined  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe

Production Costs

CommodityUnits2023
All-in sustaining costs (AISC) Copper AUD  ....  Subscribe
All-in costs Copper AUD  ....  Subscribe
** Net of By-Product.

Financials

Units2023
Sustaining costs M AUD  ....  Subscribe
Revenue M AUD  ....  Subscribe
EBITDA M AUD  ....  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 28, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 28, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 28, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 28, 2023

ContractorsYear
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.