Overview

Mine TypeOpen Pit
StageRestarting
Commodities
  • Copper
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe brownfield Nifty Copper Project has in place: - A large open cut resource with copper oxides and predominately copper sulphide ores.
- 2.8 Mtpa sulphide concentrator and SX-EW processing facilities on site.
- Associated infrastructure including power, gas, water, accommodation and airstrip with sunk capital of ~A$450 million.

The Project is fully permitted to commence open pit oxide heap leach SX-EW operations.

The Restart is focused around the first phase of heap leach retreat and oxide open pit, and it is envisaged that the life will extend to the sulphide stage of the open pit with a considerably larger resource available.
Related AssetNifty

Owners

SourceSource
CompanyInterestOwnership
Nifty Copper Pty Ltd. (operator) 100 % Direct
Cyprium Metals Ltd. 100 % Indirect
The tenure is held via Cyprium’s 100%-owned subsidiary, Paterson Copper Pty Ltd, with the Nifty mine and infrastructure and associated tenure held by Cyprium’s operating subsidiary Nifty Copper Pty Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Sediment-hosted

Summary:

The Nifty copper deposit is a sediment hosted copper deposit hosted within the Neoproterozoic sub greenschist facies of the Paterson Orogen, immediately to the east of the Archaean Pilbara Craton.

Copper mineralisation occurred/s as both supergene oxide, sulphide, and transitional mineralisation to a depth of approximately 300m and as stratabound hypogene sulphides hosted by carbonaceous and dolomitic shales, principally within the Nifty carbonate member, to a depth of approximately 600m. The mineralisation is a structurally controlled, chalcopyrite-quartz-dolomite replacement of carbonaceous and dolomitic shale within a folded sequence. The copper mineralisation is largely confined to the northern limb and keel of a significant syncline.

Weathering has altered the mineralisation to a depth of about 200m and therefore three main styles of copper mineralisation occur at Nifty:
1. Oxide dominated mineralisation consisting of malachite, azurite, cuprite, and native copper which extends to depths of up to 100m below the surface.
2. Supergene secondary sulphide mineralisation occurs overlying the base of oxidation. This style of mineralisation is dominated by chalcocite and occurs typically between 100m and 200m below the surface.
3. Primary sulphides occur in quartz-dolomite altered carbonates and shales. The primary copper mineral is chalcopyrite with minor covellite and bornite. Pyrite is a common gangue mineral but only occurs with chalcopyrite on the margins of the deposit. The primary sulphide mineralisation is located mainly in the keel of the syncline.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Copper M lbs 55322
All production numbers are expressed as cathode.

Operational metrics

Metrics
Annual production capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
* According to 2022 study.

Production Costs

CommodityUnitsAverage
C1 cash costs Copper USD  ....  Subscribe
C2 total cash costs Copper USD  ....  Subscribe
C3 fully allocated costs Copper USD  ....  Subscribe
Assumed price Copper USD  ....  Subscribe
* According to 2022 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Closure costs $M AUD  ......  Subscribe
Total CapEx $M AUD  ......  Subscribe
OP OpEx $M AUD  ......  Subscribe
Processing OpEx $M AUD 334.7
Freight costs $M AUD 17.1
Total OpEx $M AUD  ......  Subscribe
Income Taxes $M AUD  ......  Subscribe
Royalty payments $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M AUD  ......  Subscribe
After-tax Cash Flow (LOM) $M AUD  ......  Subscribe
After-tax NPV @ 7% $M AUD  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 8, 2024

EmployeesYear
...... Subscription required 2022

Aerial view: