Summary

Mine TypeUnderground
Study CompletedPreliminary Economic Assessment
StagePermitting
Commodities
  • Zinc
  • Lead
  • Silver
Mining Method
  • Drift & Fill
  • Longitudinal retreat
  • Transverse stoping
Backfill type ... Lock
Mine Life... Lock
SnapshotGorno is a high-grade polymetallic brownfield project with clean metallurgy, established infrastructure and solid growth potential. In January 2025, Altamin acquired Appian’s stake in Vedra Metals Srl, gaining full ownership of Gorno. As part of the transaction, Altamin agreed to launch a process to pursue either a direct or indirect sale or to identify a strategic partner. Argent Partners in London is leading this process.

Alternatively, Altamin may retain the project and advance it through permitting toward a Final Investment Decision and eventual production.

The Ministry of the Environment and Energy Security (MASE) required an EIA for drilling outside the approved Cime EL scope. The EIA Technical Committee later issued a favourable opinion, subject to environmental conditions, for the EIA submitted in February 2025.

The next stages of the project are to complete the mine permitting process and the Definitive Feasibility Study.

Owners

SourceSource
CompanyInterestOwnership
Vedra Metals SRL (operator) 100 % Direct
Altamin Ltd. 100 % Indirect
Gorno is owned and operated by Vedra Metals Srl, a special purpose joint-venture company established by Altamin in 2022.

On 31 October 2024, Altamin announced the acquisition of Appian Italy B.V.'s (Appian) 29.85% interest in Vedra Metals Srl (Vedra), the joint venture company holding the Gorno Project under the Subscription and Joint Venture Agreement (SJVA). The acquisition was completed and the SJVA arrangements with Appian terminated on 24 January 2025, which resulted in Altamin achieving 100% ownership of the Gorno Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Mississippi Valley Type
  • Stratabound
  • Breccia pipe / Stockwork

Summary:

The Gorno Project (‘Gorno’) encompasses an historically mined, under-explored and extensively mineralised Mississippi Valley type (‘MVT’) zinc-lead geological system with over 8km of demonstrated mineralised strike. To date the Company has explored only a portion of the western quarter of this system.

The Gorno mineral district is an Alpine Type lead-zinc deposit similar to Mississippi Valley Type (MVT) lead-zinc deposits. The mineralisation is broadly stratabound with some breccia bodies and veining also observed. Higher grade and thicker mineralisation are often associated with late-stage brittle faulting which is generally orientated north-south or east-west. The mineralogy is simple consisting of low iron sphalerite, argentiferous galena and minor pyrite. Mineralisation is hosted by the Metallifero Formation which consists predominantly of limestones with interbedded shales in the higher parts of the sequence. The Gorno deposit lies in the “Lombard Basin” of the Italian Southern Alps where during the Permian- Triassic periods a thick sedimentary pile was formed as a result of strong subsidence.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Zinc Payable metal M lbs 743 *
Zinc Concentrate kt 85 *630 *
Lead Payable metal t 77,748 *
Silver Payable metal koz 3,180 *
Lead-Silver Concentrate kt 14 *108 *
* According to 2021 study.

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing rate  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
* According to 2021 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Zinc Equivalent USD  ....  Subscribe
C1 cash costs Zinc Equivalent USD  ....  Subscribe
Assumed price Lead USD  ....  Subscribe
Assumed price Zinc USD  ....  Subscribe
Assumed price Silver USD  ....  Subscribe
* According to 2021 study / presentation.

Operating Costs

CurrencyAverage
UG mining costs ($/t milled) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2021 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
UG OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 97.9
Total OpEx $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax NPV @ 5% $M USD  ......  Subscribe
After-tax NPV @ 10% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 27, 2025

Workforce

Aerial view:

Lock

- subscription is required.