Overview
Stage | Production |
Mine Type | Tailings |
Commodities |
|
The Platinum Mile project is a tailings retreatment facility (plant) that recovers PGMs from the tailings streams of the Rustenburg Waterval and Retrofit concentrator plants. |
Source:
p. 59,60
Company | Interest | Ownership |
Sibanye-Stillwater Ltd.
|
100 %
|
Indirect
|
Platinum Mile Resources Pty. Ltd.
(operator)
|
100 %
|
Direct
|
Contractors
- Subscription is required.
Summary:
The Platinum Mile project, located adjacent to the Rustenburg operations Paardekraal tailings storage facility (TSF) is a tailings retreatment facility (plant) that recovers PGMs from the tailings streams of the Rustenburg Waterval and Retrofit concentrator plants. As it is a current tailings retreatment operation, no Mineral Resources or Mineral Reserves are declared.
Summary:
The Platinum Mile concentrator, located adjacent to the Rustenburg operations Paardekraal tailings storage facility (TSF), is a tailings retreatment facility (plant) that recovers PGMs from the tailings streams of the Rustenburg Waterval and Retrofit concentrator plants.
Recoveries & Grades:
Commodity | Parameter | 2021 | 2020 | 2019 | 2018 |
PGM
|
Recovery Rate, %
| ......  | ......  | ......  | 11.2 |
PGM
|
Head Grade, g/t
| ......  | ......  | ......  | 0.63 |
Mine Management:
Job Title | Name | Profile | Ref. Date |
.......................
|
.......................
|
|
Jul 20, 2022
|
- Subscription is required.
- Subscription is required.