The Platinum Mile project is a tailings retreatment facility (plant) that recovers PGMs from the tailings streams of the Rustenburg Waterval and Retrofit concentrator plants. |
Source:
p. 5
Company | Interest | Ownership |
Sibanye-Stillwater Ltd.
|
91.7 %
|
Indirect
|
Platinum Mile Resources Pty. Ltd.
(operator)
|
100 %
|
Direct
|
Sibanye-Stillwater has a 91.7% stake in Platinum Mile.
Summary:
The Platinum Mile project, located adjacent to the Rustenburg operations Paardekraal tailings storage facility (TSF) is a tailings retreatment facility (plant) that recovers PGMs from the tailings streams of the Rustenburg Waterval and Retrofit concentrator plants. As it is a current tailings retreatment operation, no Mineral Resources or Mineral Reserves are declared.
Summary:
Tails from the Waterval TSFs and Waterval UG2 and Retrofit concentrators are retreated at the Platinum Mile plant.
Platinum Mile operations - PGM concentrate will be sold to and processed by the Marikana processing facilities . [2019 Sibanye-Stillwater Form 10-K P.385]
Recoveries & Grades:
Commodity | Parameter | 2019 | 2018 |
PGM
|
Recovery Rate, %
| ......  | ......  |
PGM
|
Head Grade, g/t
| 0.73 | 0.63 |
- Subscription is required.
Production:
Commodity | Units | 2019 | 2018 |
PGM
|
koz
| ......  | ......  |
All production numbers are expressed as metal in concentrate.
- Subscription is required.
Operational Metrics:
Metrics | 2019 | 2018 |
Tonnes milled
| ......  | ......  |
- Subscription is required.
Mine Management:
Job Title | Name | Profile | Ref. Date |
.......................
|
.......................
|
|
Jul 31, 2020
|
- Subscription is required.
Corporate Filings & Presentations:
Document | Year |
...................................
|
2019
|
...................................
|
2019
|
...................................
|
2019
|
- Subscription is required.
Aerial view:
- Subscription is required.