• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Canada
Sudbury Smelter (Sudbury INO Operation)

This page is not tailored to
devices with screen width under 750 px.
 Location:
12 km NE from Sudbury, Ontario, Canada

  Address:
2 Longyear Drive
Falconbridge
Ontario, Canada
P0M 1S0
Phone  ...  Subscription required
Fax705-699-3932
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Canada
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Processing
  • Production
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

Asset Type Smelter
Commodities
  • Nickel
  • Copper
  • Cobalt
Processing
  • Smelting
  • Calcining
  • Electric furnace
  • Roasting
The Sudbury Smelter is part of the Sudbury Integrated Nickel Operations.

The Sudbury Smelter currently smelts Glencore Nickel nickel-copper concentrate from the Sudbury, Raglan and XNA (Australia) operations as well as feeds from third parties which includes concentrates and other materials bearing nickel and cobalt as well as other pay metals. The smelted and granulated matte is sent by rail to large port facilities in Québec City, then shipped overseas to Nikkelverk in Norway for refining into pure metals.


Owners & OPERATOR

Source: p. 40
CompanyInterestOwnership
Glencore plc. 100 % Indirect
Glencore Canada Corp. (operator) 100 % Direct

Deposit Type


Summary:


Mining Methods


Summary:


Crushing and Grinding


Processing

  • Smelting
  • Calcining
  • Electric furnace
  • Roasting

Flow Sheet: Subscription required

Summary:

The Sudbury Smelter currently smelts Glencore Nickel nickel-copper concentrate from the Sudbury, Raglan and XNA (Australia) operations as well as feeds from third parties which includes concentrates and other materials bearing nickel and cobalt as well as other pay metals.

The process uses an electric furnace to smelt the concentrate into a high-grade matte containing nickel, copper, cobalt and platinum group metals. The product, smelted and granulated matte, is transported to the Nikkelverk refinery in Norway. The facility has a maximum annual production rate of 135,000 tonnes of matte.

Process unit operations include:
• Concentrate slurry feed preparation;
• Roaster operation;
• Acid plant;
• Electric furnace operation;
• Converter operation;
• Matte granulation;
• Custom feed preparation; and
• Calciner operation.

The concentrate is fed to roasters where sulphur is removed as SO2 gas and sent to the sulphuric ........


Production:

CommodityUnits2019201820172016
Nickel t  ......  Subscription required  ......  Subscription required76,02075,933
Copper t  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
All production numbers are expressed as metal in matte.
Subscription required - Subscription is required.

Operational Metrics:

MetricsCommodityProduct2019
Annual production capacity Matte  ......  Subscription required
Subscription required - Subscription is required.

Reserves at :



Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 2, 2020
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2018
Fact Sheet 2017
Fact Sheet 2016
Subscription required - Subscription is required.

Aerial view:

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2020 MDO Data Online Inc.