Kiniero Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StageRestarting
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Kiniero gold mine operated from 2002 to 2014. The mine was placed on care and maintenance in early 2014 and was awarded to Sycamore in 2019. Robex took over the project in 2022, and now plans to restart the mine with a new 3 million tonne per annum processing plant. Mineral processing for the Kiniero Project will comprise carbon-in-leach (CIL) with gold electrowinning, in addition to gravity circuits to produce doré. The existing mining infrastructure will be refurbished and expanded with minimal additional infrastructure required.

Construction of the Kiniero Project started in Q4 2022. The first gold poured is planned for December 2025.

Owners

SourceSource
CompanyInterestOwnership
Government of Guinea 15 % Indirect
Robex Resources Inc. 85 % Indirect
Robex is the sole shareholder of Sycamore Mining Limited. Sycamore Mining Limited holds 85% of Sycamore Mine Guinee SAU (SMG,) with the Government of Guinea (GOG) holding the additional 15%. SMG is responsible for executing on-the-ground operations on the Property.

Contractors

Lock

- subscription is required.

Deposit type

  • Hydrothermal
  • Vein / narrow vein

Summary:

Deposit types
The deposits located on the Property are associated with the Proterozoic Birimian orogeny of West Africa. Most gold mineralization in the West African Craton is shear-zone-hosted and structurally controlled, with lithology having a minor, local influence. The mineralization developed in the Kiniero Gold District conforms to this general style of mineralization.

Generally, vein-hosted lode type mineralization of the Birimian-style is associated with regionally metamorphosed terrains that have undergone considerable deformation and polyphase intrusive events. Birimian deposits are typically strongly structurally controlled but are also commonly associated with rheological contrasts within and between different lithologies. Recent drilling at both the SGA and Sabali South deposits has indicated the lithostratigraphy as being key to how the differing lithologies support structural preparation at a local scale.

Gold mineralization is typically late-orogenic, medium-grade lodes which are strongly structurally controlled and located within quartz veins or in quartz-veined fracture zones with intermineralization intrusives. Structures can be classified from their textural development as to whether their origins are proximal or deep-seated. The principal structural trends have been identified through trenching and drilling and are also visible within the existing open pits. Exploration drilling has continued to target the main structural orientations with holes aiming to intercept the mineralization trends at a sub-perpendicular orientation.

Mineralization
Previous mining and more recent exploration indicate that the gold mineralization occurs in veins a few millimetres to tens of metres in width, with predominantly quartz-sulphide mineral assemblages and differing secondary minerals depending on the degree of alteration and/or overprinting. The veins generally take the form of composite anastomosed structures. At least three categories can be distinguished, corresponding to three consecutive stages of the hydrothermal process, and in turn, there is an extensive pervasive albitization event which overprints the earliest veining:

• Massive sulphide veins comprising pyrite and lesser chalcopyrite (with secondary chlorite, sericite and ± carbonate), which correspond to an initial high-temperature hydrothermal environment.

• Quartz-sulphide veins which cross-cut the sulphide veins (with secondary sericite and chlorite).

• Parallel, narrow (1 mm to 2 mm) quartz veinlets that are more tabular than the quartzsulphide veins and commonly occur as multiple sheets in the periphery and parallel to more significant massive sulphide and quartz-sulphide veins, e.g. the veinlets at Sabali South develop as local stockworks within more brittle host rocks and have well-developed alteration reaction boundaries.

A total of 47 gold anomalies have been identified on the Property (Figure 7.6), of which the following deposit clusters form the focus:

• Sabali cluster, including:
- Sabali North.
- Sabali Central.
- Sabali South (straddling the Kiniero/Mansounia boundary).
• Mansounia Central.
• SGA cluster, including:
- Sector Gobelé A (A, B, C) (SGA).
- Gobelé D. ? North-East Gobelé D (NEGD).
- East-West.
• Jean cluster, including:
- Jean East and Jean West.
- Banfara.
• Balan cluster, including:
- Derekena.
- West Balan.

In addition to the above deposits, legacy ROM, and low-to-medium grade stockpiles are also present.

Sabali Cluster
The Sabali North, Central, and South deposits occur within the same structural corridor and are broadly comparable in both their geological, lithological, and structural characteristics. From north to south there are, however, changes in the host/wall rock alteration with Sabali South being overprinted by an intense argillic alteration event, a distinguishing feature. It is noted that the observed changes in alteration might relate to vertical displacements of mineralized blocks within the corridor, rather than potential changes in character of mineralizing fluids.

Mansounia Central
The Mansounia Central deposit is located to the south to south-west of the Sabali South deposit, and had been previously segmented into three separate targets, namely the Mansounia North deposit, which now forms a part of the Sabali South deposit, the Mansounia Central deposit and the Mansounia South deposit. Mansounia Central represents a direct on strike extension of the Sabali South deposit, part of the much larger shear mineralized corridor, termed the “Sabali-Mansounia” Corridor.

SGA Cluster
The SGA Cluster of deposits are broadly geologically, structurally, and geographically related and share, in some instances, interrelated and overlapping exploration datasets. The SGA Cluster, comprised of the various Gobelé deposits, along with the Jean deposits, formed the focal point of early-exploration, development, and exploitation at the previous Kiniero Gold Mine.

Jean Cluster
Jean East and West
The Jean East and West deposits are situated immediately west of the various Gobelé deposits of SGA and were discovered at the same time as the Gobelé deposits. Jean East is characterized by thick mineralized subvertical structures elongated for approximately 500 m, trending 010°. This 010° trending structure at Jean East was mined, as well as the 350° striking mineralized structure at Jean West. The two mineralized structures at Jean are distinctly separated by a 030° trending fault.

Banfara
The Banfara deposit represents a steep sided worked out open-pit that targeted two mineralized structures, one trending north to south (a principal regional control) and dipping steeply to the west, and the other north-west to south-east dipping steeply to the east.

Balan Cluster
The Balan Cluster of deposits includes the Derekena, West Balan, Kobane, and Farabana deposits, four principal zones of mineralization which represents one the most continuous zones of mineralization yet delineated within the Project. The Balan Cluster is unique in that the mineralization has developed along east-north-east shear zones, a key strike trend in the Siguiri Basin, but which is secondary to the north-west to north-east structures which dominate the Kiniero Gold District.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Gold koz 90851
All production numbers are expressed as metal in doré.

Operational metrics

Metrics
Hourly processing capacity  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
Site cash costs (produced) Gold USD  ....  Subscribe
Total cash costs Gold USD  ....  Subscribe
All-in sustaining costs (AISC) Gold USD  ....  Subscribe
All-in costs Gold USD  ....  Subscribe
Assumed price Gold USD  ....  Subscribe
* According to 2023 study / presentation.

Operating Costs

Currency2023
OP mining costs ($/t mined) USD 3.6 *  
OP mining costs ($/t milled) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Expansion CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Closure costs $M USD  ......  Subscribe
Total CapEx $M USD  ......  Subscribe
OP OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 355.1
Refining and transportation $M USD  ......  Subscribe
G&A costs $M USD 58.9
Total OpEx $M USD  ......  Subscribe
Total Taxes $M USD  ......  Subscribe
Royalty payments $M USD  ......  Subscribe
Net revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 5% $M USD  ......  Subscribe
Pre-tax NPV @ 10% $M USD  ......  Subscribe
After-tax NPV @ 5% $M USD  ......  Subscribe
After-tax NPV @ 10% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jun 1, 2023
....................... Subscription required ....................... Subscription required Subscription required Jun 1, 2023
....................... Subscription required ....................... Subscription required Subscription required Feb 2, 2024
....................... Subscription required ....................... Subscription required Subscription required Feb 2, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Feb 2, 2024

EmployeesTotal WorkforceYear
...... Subscription required 2023
...... Subscription required 2022