Iron ore Northern System operations are located at Carajás, State of Pará in Brazil.
Northern System includes mining complexes:
- Serra Norte (three main mining areas and three beneficiation plants);
- Serra Sul (one main mining area and one beneficiation plant);
- Serra Leste (one mining area and one beneficiation plant).
Serra Norte
The Serra Norte Complex corresponds to deposits called N1, N2, N3, N4 and N5. The mines in operation are N4E, N4W and N5. Projects N1 and N2 are expected to start up in 2026 and project N3 is expected to start up in 2023.
N4 and N5 mines, currently in operation, utilize open pit mining and are operated by large loading and hauling equipment, namely, hydraulic excavators with loading capacity up to 80 ton, cable excavators with loading capacity up to 109 ton and front-end-loader with loading capacity of 72.6 ton. The haulage is carried out by truck with payload capacity of 400, 363 and 290 Tons. In some regions of these mines, where maximum relevant iron ore caves are presented, continuous miners are utilized, which eliminates drilling and blasting thereby reducing ground vibrations caused by blasting and avoiding damage to the caves near the mining areas.
The mining method at Serra Norte is open pit, as a normal standard operation used across the mining industry. Part of the material is free digging and other parts require blasting. The ore is loaded into the haul road trucks and d ........