Mining Intelligence and News
Australia

Ulan West Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Longwall
  • Continuous
Production Start... Lock
Mine Life... Lock
SnapshotThe Ulan West Mine is part of the Ulan Coal Complex.
Related AssetUlan Coal Complex

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 100 % Indirect
Ulan Coal Mines Pty Limited (UCMPL) (operator) 100 % Direct
Ulan Coal Mines Pty Limited (UCMPL) is owned by Glencore Coal Assets Australia Pty Limited.

Deposit type

  • Sedimentary

Summary:

The Ulan West underground mines the lower 3 metres of the Ulan seam for thermal coal.

The Ulan Mine Complex (Ulan No.3, Ulan West) is at the western limit of the geological formation known as the Sydney Basin and at the southern end of the Gunnedah Sub-basin. The resource coal targeted for extraction is from the Illawarra Coal Measures, which are of Permian age and overlain by sedimentary formations of varying thickness and types including sandstones, shales and alluvium. Ten coal seams (nine in the west) occur within the coal measures; eight occur above (seven in the west) and one below the Ulan Seam. These seams range in thickness from approximately 0.4 to 10 metres (with the Ulan Seam being thickest). Apart from the Ulan Seam, all seams within the mining leases are considered uneconomic in the current market due to their high ash content.

The main geological features present within the Ulan Mine Complex and in particular within the underground mining area are Triassic Narrabeen Group sandstones overlying the Permian sedimentary rocks of the Illawarra Coal Measures; and some Gulgong granite. More recent Jurassic Pilliga sandstone (over Gomiala shale) caps the Narrabeen layers in the north east and quaternary sands are present along rivers and major creeks.

The Ulan Seam generally dips uniformly towards the north-east at between one and two degrees, and the seam thickness averages 5 to 7 metres (see Stratagraphic Profile) throughout the Ulan Mine Complex. It consists of ten separate plies, which are consolidated into four working sections within the open cut. The working sections are separated by thin claystone horizons.

Current planning is for the open cut extension to mine the full seam, and the underground operations will mine the lower section of the Ulan seam. The lower section has low ash content and an average thickness of 2.75 metres; varying from 2.4 metres in the north- west, and up to 3 metres in the south.

Within the areas to be worked throughout the mine life, the depth of cover will generally increase where extraction progresses toward the north east, due to a combination of topography and a dipping seam.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Combined production numbers are reported under Ulan Coal Complex

Operational metrics

Metrics2024202320222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe6,496,341 t7,307,735 t6,328,115 t6,730,419 t7,048,147 t
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 29, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required May 29, 2024
....................... Subscription required ....................... Subscription required Subscription required May 29, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required May 29, 2024

Aerial view:

Lock

- subscription is required.