Mining Intelligence and News
Australia

Shine (Mid-West) Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotShine Iron Ore Mine is a shovel-ready project that provides optionality for Fenix to market high-quality blended iron ore products.

In July 2024, Fenix announced the approval of recommencement of mining operations at Shine, which had been acquired from Mount Gibson in July 2023. The current mine plan assumes a build-up of high-grade mined ore before crushing commences in late October 2024, with haulage and shipment volumes to increase from initial levels once stockpile volumes enable a sustainable level of increased sales tonnages. The first shipment of ore from Shine is planned for late October/early November 2024, comprising ore from existing low-grade stockpiles.

The approval to proceed with the Stage 1 mine plan for Shine follows a comprehensive review of all aspects of the project.

Stage 2 and Stage 3 mine plans will be assessed following further optimisation work, with significant opportunity for Fenix to extend mine life at Shine subject to future approvals.

Owners

SourceSource
CompanyInterestOwnership
Fenix Resources Ltd. 100 % Indirect
On 24 July 2023, Fenix Resources Ltd. announced that it had completed the acquisition of Mount Gibson’s Shine Mine.

Deposit type

  • Banded iron formation

Summary:

The Shine Hematite deposit is located within the Warriedar Fold Belt which is part of the Archaean The Shine Hematite and Magnetite deposit is located within the Warriedar Fold Belt which is part of the Archaean Yalgoo-Singleton greenstone belt. The deposit is located along a north-northwest trending sub-vertical 50-120m wide banded iron formation (BIF) of the Windanning Formation which is part of the Luke Creek Group.

The BIF forms a prominent ridge which is approximately 50m to 90m wide in the Shine area. A sequence of mafic, ultramafic and pelitic sediments bounds the BIF to the east while a talc-rich ultramafic schist dominates west of the BIF. Where the BIF does not outcrop, it is covered by lateritic or colluvial material. The iron mineralisation (goethite, hematite and magnetite) is strata bound occurring only within the BIF unit.

The host Banded Iron Formation of the Shine iron mineralisation is sub-vertical and dips to the west at approximately -85o.

The iron mineralisation has been interpreted based on a mixture of Fe threshold grades and the geological and geophysical logging. Iron mineralisation occurs as hematite-goethite in the upper portions of the BIF, with magnetite occurring at depth below the base of oxidation which is approximately 100m below surface.

The boundary between the hematite and magnetite is interpreted to occur over a relatively narrow zone (a few metres) and as such no transitional zone was modelled. An east-west striking, shallow dipping, narrow dolerite dyke is interpreted which stopes out the mineralisation. The northern and southern areas of the BIF and associated iron mineralisation are covered by a siliceous capping (a product of near-surface weathering processes), which thickens to the north and south (i.e. this zone is thinnest in the central parts of the deposit).

Outcrops of the iron mineralisation and various lithologies, confirms the validity of the geological interpretation based on the drilling. Alternative interpretations of the mineralisation are unlikely to significantly change the overall volume of the Fe mineralised envelopes in terms of the reported classified resources at a 50% Fe cut-off.

Dimensions
The Shine deposit is hosted within a north-south trending BIF. The mineralisation parallels the stratigraphy, trends roughly north-south and is sub-vertical, with a total strike length of about 1.7 km. The mineralisation occurs mainly in two sub-parallel zones which are up to 30 m wide in places.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits20222021Avg. Annual (Projected)LOM (Projected)
Iron Mt  ....  Subscribe  ....  Subscribe1.42.6
All production numbers are expressed as lump & fines.

Operational metrics

Metrics20222021
Ore tonnes mined  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe
Tonnes milled  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Financials

Units20222021
Capital expenditures M AUD  ....  Subscribe  ....  Subscribe
Revenue M AUD  ....  Subscribe  ....  Subscribe
EBIT M AUD  ....  Subscribe  ....  Subscribe
EBITDA M AUD  ....  Subscribe  ....  Subscribe
Operating Cash Flow M AUD  ....  Subscribe
Book Value M AUD  ....  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2024

Aerial view:

Lock

- subscription is required.