• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Australia
Eastern Range Mine (Hamersley Iron Operation)

This page is not tailored to
devices with screen width under 750 px.
 Location:
63 km S from Tom Price, Western Australia, Australia

  Regional Office:
152-158 St George's Terrace
Perth
Western Australia, Australia
6000
Phone  ...  Subscription required
Fax+61-8-9366-5468
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life2024
The mine is operated by Rio Tinto as part of the Greater Paraburdoo mining hub.


Owners

Source: p. 384
CompanyInterestOwnership
China Baowu 46 % Indirect
Rio Tinto plc 54 % Indirect
Hamersley Iron Pty Ltd. (operator) 54 % Indirect
Rio Tinto owns 54% of the Bao-Hi joint venture with the remaining 46% held by China Baowu

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Banded iron formation


Summary:

Mineralisation at Eastern Range occurs as haematite/goethite mineralisation hosted within the banded iron formations of the Brockman Formation.

The Pilbara region comprises a large part of the ancient continental shield of Western Australia which is comprised of both Proterozoic and Archaean rocks. The Pilbara is overlain by the Proterozoics deposited in the Hamersley and Bangernall Provinces.

The BIF is a member of the ~620 m thick Brockman Iron Formation which makes up part of the 2.63 2.45 Ga Hamersley Group. The Hamersley Group comprises almost 2.5 km of consecutive sedimentary and volcanic rocks located within the ca. 80,000 km2 Hamersley Province of the Pilbara craton in North West Australia, approximately 1100 km north of Perth. In the lower part, it consists of dolomite, shale and BIF, while the upper part consists of dolerite, various lava types and BIF with minor amounts of tuffs and shales. Underlying the Hamersley Group, is the 2.78–2.63 Ga Fortescue Group, which consists of flood basalts and rhyolites. These volcanics were laid down on the uplifted and eroded Pilbara block. This volcanic succession may contain remnants of a Large Igneous Province (LIP).

The Brockman Iron Formation ofthe Hamersley Group is divided into four sub-lithostratigraphic units, namely the lowermost Dales Gorge Member (BIF), the Whaleback Shale Member, the Joffre Member (BIF), and the uppermost Yandicoogina Shale Member. After deposition, these laterally ex ........


Mining Methods

  • Truck & Shovel / Loader


Summary:

The Eastern Range iron ore mine is located in the Pilbara region of Western Australia, with the closest town being Paraburdoo, 8 km to the north. It falls within the local authority of the Shire of Ashburton. The mine is operated by Rio Tinto as part of the Greater Paraburdoo mining hub. Operations at Eastern Range span deposits at 23-24 East, 32 East, 37-42 East, 42 East and future mining at 42EE and the 47E deposits.

Ore is extracted using traditional open pit, drill and blast and load and haul methods.


Crushing and Grinding


Processing

Source: Subscription required

Summary:

- subscription is required.


Combined production numbers are reported under Hamersley Iron Operation


Reserves at December 31, 2020:

CategoryTonnage CommodityGrade
Proven 18 Mt Iron 61.4 %
Probable 4 Mt Iron 60.3 %
Proven & Probable 22 Mt Iron 61.2 %
Measured 22 Mt Iron 60 %
Indicated 7 Mt Iron 60 %
Inferred 2 Mt Iron 59.2 %
Total Resource 31 Mt Iron 60 %


Pipelines
TypeMaterialDiameterLengthDescription


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 5, 2022
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2019
Other 2016
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.