Mining Intelligence and News
Australia

Anthill Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Copper
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Anthill Project includes the Anthill Mine and the Mount Kelly copper oxide heap leach and plant facility.

Anthill is expected to be fully mined by November 2025 and processed over the next 12 months. Mine life is expected to be extended through ongoing drilling, further acquisitions, and optimisation of the remaining mining pits by CSA Global, which aims to push the operation beyond 2030.

In late 2024, mechanical failures in the crushing and stacking circuit temporarily reduced processing capacity. Comprehensive rectification and optimisation works restored full capacity, enabling increased copper production by December and improving system stability.

Owners

SourceSource
CompanyInterestOwnership
Austral Resources Australia Ltd. (operator) 100 % Indirect
The Anthill oxide copper mine is owned by Austral Resources Australia Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Breccia pipe / Stockwork

Summary:

The mineral resources comprise secondary oxide copper mineralisation that form as sub-horizontal blankets in the ferruginous saprolite horizon, immediately above underlying copper sulphide mineralisation which is structurally controlled. Oxide copper mineralisation occurs predominantly in the form of malachite, with minor amounts of azurite, chrysocolla, cuprite, and rare native copper. The primary sulphide mineralisation occurs as chalcopyrite and pyrite, with cuprite and chalcocite occurring in the transitional zone between the oxide and sulphide zones.

The Anthill deposit is hosted predominantly within the Esperanza Formation. The host lithology of the orebody is inferred to be dolomitic siltstones; however, the strong weathering and oxidation process has resulted in the near complete loss of dolomite from the rock in the upper oxide zone. The mineralisation appears to be controlled by a combination of steep structural elements and broad dome features. The Anthill transition is commonly hosted in structurally controlled silicified zones as well as in silicified sedimentary breccia in dolomite, which appear to have been a preferred permeability horizon for mineralising fluids.

Anthill deposit dimensions
Approximately 1,700 m x 770 m and ranges in thickness from less than 10 m to approximately 40 m; mineralisation is subdivided into three areas: Anthill East, Anthill West, and Anthill Link (low-grade).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

The production volume for 2022 and 2024 is shown in terms of sales.
CommodityUnits202420232022
Copper t  ....  Subscribe  ....  Subscribe  ....  Subscribe
All production numbers are expressed as cathode.

Operational metrics

Metrics202420232022
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily ore mining rate  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily processing rate  ....  Subscribe  ....  Subscribe  ....  Subscribe
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Mine Financials

Units202420232022
Revenue M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Gross profit M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Pre-tax Income M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
After-tax Income M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 13, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 10, 2021
....................... Subscription required ....................... Subscription required Subscription required Sep 10, 2021
....................... Subscription required ....................... Subscription required Subscription required Nov 13, 2025

Workforce

Aerial view:

Lock

- subscription is required.