• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Brazil
Mineração Usiminas (MUSA) Operation

This page is not tailored to
devices with screen width under 750 px.
 Location:
50 km SW from Belo Horizonte, Brazil

  Address:
Distrito Povoado de Samambaia, s/n° - Rural Area
Brazil
35685-000
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Brazil
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mineração Usiminas (MUSA) has four mines (Mina Oeste, Mina Central, Mina Leste/Camargos and Mine Pau de Vinho) of which three are in operation. Mineração Usiminas comprises three operations: West, Central, and East Mines. Main purpose is the extraction and processing of iron ore in the form of pellet feed, sinter feed and granules.

Among the contemplated projects, the implementation of a sludge centrifugation project and the construction of infrastructure for dry stacking of tailings stand out.


Owners

Source: p. 26
CompanyInterestOwnership
Sumitomo Corp. 30 % Indirect
Usinas Siderurgicas De Minas Gerais S.A. 70 % Indirect
Mineração Usiminas (MUSA) is a joint venture between Usinas Siderurgicas De Minas Gerais S.A. (Usiminas), which holds 70% of the company and Japanese group Sumitomo Corporation, holding the remaining 30%.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Iron formation hosted


Summary:

The Mineração Usiminas mineral claims are located along the western segment of Curral ridge, locally referred to as the Serra Azul (literally Blue Ridge). The Serra Azul, extending for ca 30 km in the NE-SW, is underlain by a continuous outcrop belt of the Cauê Formation, which hosts several iron ore deposits (Simmons, 1968; Romano, 1989; Romano et al, 1991; Alkmim, 2009), including the Western, Central and Eastern mines, as well as the Camargos and Pau de Vinho deposits of the Mineração Usiminas. As part of the Curral ridge, the Serra Azul is the morphologic expression of an overturned, SE-dipping homocline that involves Rio das Velhas and Minas strata (Dorr, 1969). Along the Serra Azul, the basal units of the Minas supergroup are very thin and Gandarela Dolomite is absent for over almost its whole length (Simmons, 1968; Alkmim, 2009).

The Serra Azul overturned homocline can be subdivided into three structural domains (Alkmim 2009). Along the structural domain I, which encompasses the Western Mine and the major part of the Central Mine, the thickness of the overturned Cauê Iron Formation increases from west to east, varying from around 50 m, at the western end of the ridge, to 250 m at the Central Mine. The dips also increase from west to east, being 20o at Ponta da Serra and reaching 45o at Central Mine. Standard itabirites and their weathering products are the more abundant ore types in this domain. The amount of fresh magnetitic itabirite is negligible. Howeve ........


Mining Methods

  • Truck & Shovel / Loader


Summary:

(Translated from Portuguese by Google Translate)
Deposits will continue to be mined using the classic method of successive open pit benches.

The friable materials will be dismantled and loaded using excavators, which will unload onto trucks with a nominal capacity of 40 t. These will carry out the transport to the destination area. In the case of compact / semi-compact materials, their dismantling will be carried out with the use of explosives, later also being loaded onto trucks using loaders.

Materials considered sterile will be transported to the pile of the genus, while rich ore (Fe > 49%) will be transported to Ore Treatment Facility's located in the Oeste and Central mines.

For the upstream slopes of the massif, the following characteristics were defined: maximum height of 6m; 20° face angle; and maintenance of countertops 5m wide to preserve the massif. As for the slopes inside the reservoir, the following characteristics were defined: maximum height of 3m; face angle of 33° and berms with a minimum width of 5m upstream of the massif.


Crushing and Grinding


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits2022202120202019201820172016
Iron Ore Mt  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required5.642.8
All production numbers are expressed as lump & fines.
Subscription required - Subscription is required.

Operational Metrics:

Metrics2022202120202019
Plant annual capacity  ......  Subscription required  ......  Subscription required12 Mt12 Mt
Subscription required - Subscription is required.

Reserves at December 31, 2022:

CategoryTonnage Commodity
Total Resource 2,400 Mt Iron Ore

Commodity Production Costs:

CommodityUnits20222021
Total cash costs Iron Ore USD  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required.

Financials:

Units20222021202020192018
Capital expenditures M BRL  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 76  
Revenue M BRL  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 1,085  
Operating Income M BRL  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required -7.5  
Gross profit M BRL  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 337.8  
Pre-tax Income M BRL  ......  Subscription required  ......  Subscription required 353.8  
After-tax Income M BRL  ......  Subscription required  ......  Subscription required 272.9  
EBITDA M BRL  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 203  
Subscription required - Subscription is required


Water Supply
Source: Subscription required

- subscription is required.


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2023
....................... Subscription required ....................... Subscription required Subscription required Aug 16, 2023
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2023
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2023
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2023
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2023
Subscription required - Subscription is required.

Staff:

EmployeesContractorsTotal WorkforceYear
Subscription required Subscription required Subscription required 2022
Subscription required Subscription required Subscription required 2021
Subscription required Subscription required Subscription required 2020

Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2022
Other 2022
Quarterly Report 2022
Sustainability Report 2022
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
Financial Review 2017
Environmental Assessment 2014
Other 2011
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.