Nolans Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
135 km N from Alice Springs, Northern Territory, Australia

  Project Contacts:
Level 6, 432 Murray St
PO Box 5773
Perth
Western Australia, Australia
6000
Phone  ...  Subscription required
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StagePermitting
Mine TypeOpen Pit
Commodities
  • REE
Mining Method
  • Truck & Shovel / Loader
Mine Life38 years (as of Jan 1, 2021)
The Nolans Project will encompass a mine, process plant (comprising beneficiation, extraction and separation plants) and related infrastructure to be constructed and located at the Nolans site, 135 kilometres north of Alice Springs in Australia’s Northern Territory.
Latest NewsArafura Rare Earths calls for $120m     December 2, 2022


Owners

Source: p. 16
CompanyInterestOwnership
Arafura Resources Ltd. 100 % Indirect
In July 2020, the Northern Territory Government granted the Mineral Leases (MLs) for the Nolans NdPr Project to Arafura Rare Earths Pty Ltd (ARE), a wholly owned subsidiary of Arafura Resources Limited.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Vein / narrow vein
  • Pegmatite


Summary:

The Nolans Bore deposit is spatially close to several tin and tantalum pegmatites, and REE-bearing carbonatite/alkaline complexes (Mud Tank and Mordor Igneous Complex). This mineral field of carbonatites, pegmatites, and other REE occurrences is in a region transacted by three major lineaments delineated by O’Driscoll, which include the north–northwest trending G2-gravity lineament that is considered to be spatially related to the Olympic Dam deposit and northwest-trending G3-gravity.

The mineralisation at the Nolans Bore deposit is hosted in a series of east-northeast trending, and steeply dipping to the northwest, fluorapatite veins and breccia zones. The granite-gneiss host has been strongly kaolinised due to weathering.

Huston et al. (in press) describe four styles of mineralisation: massive fluorapatite veins that typically contain 4–6% REE oxides and constitute most of the defined resource; very high-grade (7º–10% REE oxide) zones found in cheralite-bearing, apatite-poor kaolinitic zones outside of the veins; apatite allanite epidote zones hosted by calc-silicates; and low-grade stockwork zones in gneiss and kaolinitised rock adjacent to the veins and mylonite zones.


Mining Methods

  • Truck & Shovel / Loader


Summary:

The mining method selected is open cut utilising conventional hydraulic excavator and haul truck fleets. The open pits will be developed using multiple stage pit designs, all of which have been completed to a FS standard. Ramps are designed at 1 in 10 gradient, 30m wide except for lower pit levels and small sub-pits where the ramps are designed at 21m wide.

The overall pit slope angles in the final stage of pit design vary between 34° and 45°, including allowances for pit access ramps.


Crushing and Grinding


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Projected Production:

CommodityProductUnitsAvg. AnnualLOM
P2O5 Acid kt 782,813
Nd2O3+Pr6O11 Oxide t  ......  Subscription required  ......  Subscription required
Middle Rare Earth Oxides t  ......  Subscription required  ......  Subscription required

Operational Metrics:

Metrics
Annual production capacity  ......  Subscription required
Tonnes processed, LOM  ......  Subscription required
Annual processing capacity  ......  Subscription required
* According to 2021 study.
Subscription required - Subscription is required.

Reserves at March 16, 2020:
Cut-off grade at 1% TREO.

Mineral Resources is unchanged from 7 June 2017.

CategoryTonnage CommodityGrade
Proven 5 Mt Total Rare Earth Oxides 3 %
Proven 5 Mt P2O5 13 %
Probable 24.6 Mt Total Rare Earth Oxides 2.8 %
Probable 24.6 Mt P2O5 13 %
Proven & Probable 29.5 Mt Total Rare Earth Oxides 2.9 %
Proven & Probable 29.5 Mt P2O5 13 %
Measured 4.9 Mt Total Rare Earth Oxides 3.2 %
Measured 4.9 Mt P2O5 13 %
Indicated 30 Mt Total Rare Earth Oxides 2.7 %
Indicated 30 Mt P2O5 12 %
Inferred 21 Mt Total Rare Earth Oxides 2.3 %
Inferred 21 Mt P2O5 10 %
Total Resource 56 Mt Total Rare Earth Oxides 2.6 %
Total Resource 56 Mt P2O5 11 %

Commodity Production Costs:

CommodityUnitsAverage
Credits (by-product) Nd2O3+Pr6O11 USD  ......  Subscription required&nbs
Cash costs Nd2O3+Pr6O11 USD  ......  Subscription required&nbs
Cash costs Nd2O3+Pr6O11 USD  ......  Subscription required *†
Assumed price Nd2O3+Pr6O11 USD  ......  Subscription required&nbs
* According to 2021 study / presentation.
† Net of By-Product.
Subscription required - Subscription is required.

2021 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscription required
After-tax NPV @ 8% $M AUD  ......  Subscription required
After-tax IRR, %  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2022
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2022
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2022
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2022
....................... Subscription required ....................... Subscription required Subscription required Nov 14, 2022
Subscription required - Subscription is required.

Staff:

Total WorkforceYear
Subscription required 2021

Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2022
Corporate Presentation 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
Annual Report 2017
Other 2010
Subscription required - Subscription is required.

News:

NewsDate
Arafura Rare Earths calls for $120m December 2, 2022

Subscription required - Subscription is required.