Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
Mine Life | 46 years (as of Jan 1, 2021) |
Phase 1 of the Julong Copper Mine in Tibet completed construction and commenced production. After reaching designated production capacity, annual copper production volume will be approximately 160 thousand tonnes.
Phase 2 of the Julong Copper Mine in Tibet is expected to add 200,000 tonnes of annual copper metal production capacity. |
Source:
p. 1
Tibet Julong Copper, established in December 2006, was granted the mining rights for the Qulong, Rongmucuola, and the Zhibula copper polymetallic deposits in the region.
Tibet Zijin, a wholly-owned subsidiary of Zijin Mining, acquired an aggregate 50.1% equity interest in Tibet Julong Copper comprising Zhangge Venture Capital Group (12.88%), Zhongsheng Mining (18%), Zhangge Company (6.22%), Shenzhen Chenfang (10%) and Huibaihong Industrial (3%) in July 2020. Zhangge Company and Mozhugongka County retain the remaining 24.9% and 25% stakes in the project.
Zijin Mining Group is the majority owner and the operator of the Qulong copper and polymetallic mine.
Contractors
- Subscription is required.
Summary:
The projects are situated in the northern mountain foot of western Guokalariju, eastern lower mountain of the Gangdise Mountains. It is precipitous. The southern part is high while the northern part is low with a strong cutting and glacier landform. The highest altitude is 5,566m. The elevation of the base level of erosion near the mining area is approximately 3,900m. The vegetation at the gullies and two sides is mainly high-mountain meadow. There is basically no tree and the vegetation is simple.
The Qulong porphyry-type copper and molybdenum deposit is located at the Gandise metallogenic belt of the Tethys-Himalayan metallogenic province, one of the main porphyry-type copper mine metallogenic provinces in the world. The existing Qulong Copper and Polymetallic Mine and the Rongmucuola Copper and Polymetallic Mine in the deposit are a complete porphyry-type copper deposit with a burial depth of 3 to 96m, which is generally a concealed to semi-concealed deposit. The deposit is east-west oriented with length of 2.27km, width of 1.50km from north to south in an oval shape. The ore is mainly structured by veinlet-disseminated orebody.
Summary:
As the deposit is large, thick, shallowly buried with partially exposed surface, the stripping ratio for open-pit mining is low, which is suitable for large-scale open-pit mining. They was designed as one pit for open-pit mining.
847 million tonnes of ores will be mined and utilised in phase 1, at Cu 0.42%, Mo 0.022%. The average stripping ratio will be 0.26t/t. After completion of phase 1 construction, the annual production will be 165 thousand tonnes of copper and 6,200 tonnes of molybdenum.
Mining scope: above 4,500m (mining permit for above 4,452m).
Boundary length: 2,900m Ă— 2,650m.
Elevation of the pit bottom: 4,500m.
Elevation of entrance and exit of the trench: 5,010m.
Slope angle: 39 - 44 degrees.
Source:

- subscription is required.
Source:

- subscription is required.
Production:
Commodity | Units | 2022 | 2021 |
Copper
|
t
| ...... ^ | ......  |
Silver
|
kg
| | ......  |
All production numbers are expressed as metal in concentrate.
^ Guidance / Forecast.
Reserves at December 31, 2021:
Qulong Copper Mine: Cut-off grade within open-pit mining boundary Cu 0.2%; Cut-off grade outside open-pit mining boundary Cu 0.4%.
Zhibula: Cut-off grade within open-pit mining boundary Cu 0.3%; Cut-off grade outside open-pit mining boundary Cu 0.5%.
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven & Probable
|
t
|
Copper
|
0.34 %
|
10,359 kt
|
Total Resource
|
t
|
Copper
|
0.38 %
|
13,773 kt
|
Financials:
| Units | 2021 |
Operating Income
|
M RMB
| ......  |
After-tax Income
|
M RMB
| ......  |
- Subscription is required
Type | Material | Diameter | Length | Description |
- Subscription is required.
Staff:
Employees | Year |
|
2021
|