Mining Intelligence and News
Spain

MATSA Complex

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Copper
  • Zinc
  • Lead
  • Silver
Mining Method
  • Sub-level open stoping (SLOS)
  • Transverse open stoping
  • Longhole open stoping
  • Longitudinal open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotThe MATSA Copper Operations is a substantial polymetallic mining operation comprising a 4.7Mtpa central processing facility that sources ore from three underground mines, Aguas Teñidas and Magdalena Mines in Almonaster la Real and the Sotiel Mine in Calañas, producing copper, zinc and lead mineral concentrates.
Related Asset

Owners

SourceSource
CompanyInterestOwnership
Sandfire Resources Ltd. 100 % Indirect
Ownership: 100% Sandfire Resources Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • VMS

Summary:

The MATSA Copper Operations comprises copper-zinc-lead deposits of three mines: Aguas Teñidas, Magdalena and Sotiel and three Projects.

The MATSA deposits are all interpreted to be volcanogenic massive sulphide, or VMS, deposits. VMS deposits are predominantly stratiform accumulations of sulphide minerals that precipitate from upwelling hydrothermal fluids associated with magmatism on or below the seafloor in a wide range of geological settings.

The deposits at Aguas Teñidas and Magdalena mines also have stockwork sulphide zones in the footwall that can be quite extensive and are characterised by primarily pyrite and chalcopyrite mineralisation.

The deposits which comprise the Project have been categorised as Kuroko type VMS deposits based on their mineralogy, geological setting, and geometry/size.

Dimensions
Polymetallic mineralisation in Aguas Teñidas mine is related to four tabular lens shaped bodies. Together Aguas Teñidas and Western Extension extend from approximately 270m to 890m below surface. Mineralisation extends for 3,000m along west-east strike, dipping 80° to the north. The cumulative total true width of mineralisation ranges from 10m to 80m. Calañesa is a smaller tabular lens extending from approximately 100m below the surface. Mineralisation extends for 400m along westeast strike, dipping 60° to the south. The cumulative total true width of mineralisation ranges from 1m to 4m. Castillejito is composed of two tabular lenses with synclinal shape extending from approximately 100m below the surface located to the North of Aguas Teñidas. Mineralisation extends for 750m along West-East strike, dipping 68° to the north. The cumulative total true width of mineralisation ranges from 10m to 50m

Polymetallic mineralisation in Magdalena mine is related to tabular lens shaped bodies extending from approximately 100m to 830m below surface. Mineralisation extends for 2,000m along West-East strike, dipping 70° to the north. The cumulative total true width of mineralisation ranges from 3m to 70m.

Polymetallic mineralisation in Sotiel mine is related to four tabular lenses shaped bodies extending from approximately 200m to 400m below surface. Mineralisation extends discontinuously; Calabazar and Sotiel extend 600m along a 60°E strike, dipping 40° to the northwest. The cumulative total true width of mineralisation ranges from 3m to 30m; Migollas extends 250m along 60°E strike, dipping 40° to the northwest. The cumulative total true width of mineralisation ranges from 3m to 20m; Elvira extends 400m along 60°E strike, dipping 40° to the northwest. The cumulative total true width of mineralisation ranges from 10m to 40m.

Polymetallic mineralisation in Castillo-Buitrón is composed of two east-west oriented tabular lens outcropping to surface, dipping 70° to the north: Poniente and Levante. The former extends for 170m along strike and 300m in depth, with thickness from 5m to 20m, and the latter extends for 90m along strike and 200m in depth, with thickness ranging from 5m to 12m

Polymetallic mineralisation in Concepción is related to east-west oriented tabular lens outcropping to the surface, dipping 67° to the north. It currently extends for 500m along strike and 700m in depth, with thickness ranging from 5m to 50m (higher thickness is reached in the upper part were two lenses run parallel).

Polymetallic mineralisation in Poderosa is composed of two parallel East-West oriented tabular lenses, recognisable from 200m below surface. Mineralisation extends for 250m along strike, 750m in depth with thickness ranging from 5m to 38m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Production 5 months to June 2022(Sandfire Resources completes acquisition of MATSA mining complex effective February 1, 2022).
CommodityProductUnits20242023202220202019201820172016
Copper Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe297334346295
Copper Metal in concentrate t  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Payable metal t  ....  Subscribe  ....  Subscribe  ....  Subscribe
Zinc Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe185222148162
Zinc Metal in concentrate t  ....  Subscribe  ....  Subscribe  ....  Subscribe
Zinc Payable metal t  ....  Subscribe  ....  Subscribe  ....  Subscribe
Lead Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe46371221
Lead Metal in concentrate t  ....  Subscribe  ....  Subscribe  ....  Subscribe
Lead Payable metal t  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver Metal in concentrate koz  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver Payable metal koz  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Equivalent Metal in concentrate t  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Operational metrics

Metrics20242023202220212020201920182017
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4.3 M dmt4.23 M dmt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4,298,664 t4,337,000 t4,253,000 t
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4.4 Mt
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe500,000 t of concentrate
^ Guidance / Forecast.

Production Costs

CommodityUnits202420232022
Credits (by-product) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
C1 cash costs Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
C1 cash costs Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.
** Net of By-Product.

Operating Costs

Currency2023
Total operating costs ($/t milled) USD 76  

Financials

Units20242023202220202019
Capital expenditures (planned) M USD  ....  Subscribe
Sustaining costs M USD  ....  Subscribe  ....  Subscribe
Capital expenditures M USD  ....  Subscribe  ....  Subscribe
Revenue M  ....  Subscribe  ....  Subscribe  ....  Subscribe 474  EUR
After-tax Income M  ....  Subscribe 41  EUR
EBIT M  ....  Subscribe  ....  Subscribe
EBITDA M  ....  Subscribe  ....  Subscribe
Operating Cash Flow M  ....  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.


AV - Autonomous

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2023

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required 2020
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.