Overview
Status | Temporary Suspension |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Processing |
- Wash plant
- Wet Screening
- Flotation
|
On August 31, 2018, Mosaic made the decision to temporarily idled the South Pasture Mine. The decision followed an earlier idling of Plant City manufacturing facility which processed much of the rock mined at South Pasture. No restart timeline has been established for South Pasture. |
Source:
p. 8
Summary:
The phosphate deposits of Florida are of sedimentary origin and are part of a phosphate-bearing province that extends from southern Florida north along the Atlantic coast into southern Virginia
Summary:
The Mosaic extracts phosphate ore using large surface mining machines - “draglines”. Prior to extracting the ore, the draglines must first remove a 10 to 50 foot layer of sandy overburden.
Processing
- Wash plant
- Wet Screening
- Flotation
Source:
Summary:
The Mosaic processes the ore at beneficiation plant. The ore goes through washing, screening, sizing and flotation processes designed to separate the phosphate rock from sands, clays and other foreign materials.
Beneficiation Plant Operations:
Washer
* Removes oversize material.
* Produces “pebble” phosphate.
* Removes clay by scrubbing and rinsing.
* Feeds all undersized phosphate and sand to the sizer.
* Same-sized sand and phosphate is pumped to the flotation plant for separation.
Flotation Plant
* Produces fine-sized “Concentrate” phosphate.
* Uses special additives (mostly biodegradable oils from the pulp and paper industry) to coat the phosphate.
* Phosphate separates from the sand, floats to the top and is skimmed off.
* Pumps sand back to the field for reclamation.
Blended phosphate rock is loaded onsite and transported to manufacturing facilities via rail, truck and vessel.
Recoveries & Grades:
Commodity | Parameter | 2018 | 2017 | 2016 | 2015 | 2014 |
Phosphate rock
|
Head Grade, %
| 28.6 | 28.6 | 28.6 | 28.1 | 27.9 |
Production:
Commodity | Units | 2018 | 2017 | 2016 | 2015 | 2014 |
Phosphate rock
|
Mt
| ......  | 2.8 | 3.3 | 3.3 | 2.6 |
All production numbers are expressed as concentrate.
- Subscription is required.
Operational Metrics:
Metrics | 2019 | 2018 | 2017 | 2016 |
Annual production capacity
| ......  | ......  | ......  | 3.2 Mt of phosphate rock concentrate |
- Subscription is required.
Reserves at December 31, 2019:
Category | Tonnage | Commodity | Grade |
Proven & Probable
|
137.9 Mt
|
P2O5
|
28.9 %
|
Heavy Mobile Equipment as of February 3, 2020:
HME Type | Quantity |
Dragline
|
1
|
Corporate Filings & Presentations:
- Subscription is required.
Aerial view:
- Subscription is required.