Buck Creek Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
28 km NE from Madisonville, Kentucky, United States

  Address:
373 Whobry Road
Rumsey
Kentucky, United States
42371
Phone  ...  Subscription required
Fax+1-812-406-4400
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in United States
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StatusInactive / Suspended
Mine TypeUnderground
Commodities
  • Coal (thermal)
Mining Method
  • Continuous
  • Room-and-pillar
Production Start...
Mine Life25 years (as of Jan 1, 2019)
The Buck Creek Complex includes Poplar Grove Mine and the permitted Cypress Mine .

In February 2021, the United States Bankruptcy Court for the Western District of Kentucky confirmed Hartshorne’s plan of liquidation. In February 2021, the plan of liquidation became effective, and Hartshorne commenced the final stages of winding up the estates.

Hartshorne executed a liquidation trust agreement and transferred its remaining assets and liabilities to a liquidation trust, as well as assigning remaining critical contracts and insurance policies. Hartshorne funded the carve-out escrow with the majority of Hartshorne’s cash-on-hand and transferred any remaining cash to the liquidation trust. The Hartshorne entities were dissolved on the effective date. The remaining assets will be liquidated by the trustee over time.

There were no mining production activities during the March 2021 quarter.


Owners

 
CompanyInterestOwnership
Paringa Resources Ltd. Indirect
Hartshorne Mining LLC Indirect

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sedimentary


Summary:

The Coal Resource Estimate (CRE) is located in Hopkins and McLean County, Kentucky, within the Carbondale Formation. The WK No.9 and WK No, 11 Seams associated with the Buck Creek Complex have been identified as exhibiting potential underground mineable resource tonnage.

The primary coal-bearing formations on the Buck Creek Complex are situated in the Western Kentucky Coal Field of the Illinois Basin (or Eastern Interior Basin) of the USA and are of middle Pennsylvanian-age. These strata include conglomerate, sandstone, siltstone, shale, limestone, and coal that were deposited primarily in coastal deltaic settings. Coal rank in this area is high volatile bituminous C, with higher rank coals sometimes found along major structural fault systems. Coal in the West Kentucky Coal Field is generally medium to high sulfur, exhibiting average sulfur contents of more than 3.0 percent and averaging more than 5.0 pounds of SO2 per million Btu.

The strata on the Buck Creek Complex generally exhibit a regional northeast-southwest strike, and a regional northwestward dip towards the center of the Illinois Basin, with offsets along the fault zone. As the strata bend around the nose of the basin, strike rotates from northeast to north to northwest, along with an associated change in dip direction. Depth of cover increases gradually to the northwest towards the center of the basin. Depth of cover to the WK No. 9 seam ranges from approximately 240 feet (76 metres)-) in th ........


Mining Methods

  • Continuous
  • Room-and-pillar


Summary:

The Company commenced mining with its first continuous miner (“CM”) in March 2019. Underground mining and development significantly progressed during the June 2019 quarter, with the slope development contractor demobilised from the mine site and activities transitioned to Paringa managed operations.

The Company successfully installed and commissioned the slope conveyor and established the permanent underground ventilation system. Operations using the mine slope conveyor allowed the Company to commence a typical underground room and pillar mining sequence and enabled significantly increased production rates.

Paringa utilises room and pillar operations at Poplar Grove, an efficient and low-cost mining method widely employed in coal mines around the world. Room and pillar mining is undertaken by continuous mining units (“Unit”), with each Unit consisting of two CMs and other ancillary equipment.

Mining began utilising the two CMs which form Unit 1, with ramp-up activities progressing well and productivity increasing. Construction of the ventilation overcasts are complete and the split ventilation system is commissioned, enabling the concurrent operation of both CMs in Unit 1. Regulatory approval has also been received for an extended cut plan for Unit 1.

Unit 2 entered production in July 2019 and the split ventilation system has also been completed, enabling the concurrent operation of two continuous miners in Unit 2, taking the tot ........


Crushing and Grinding


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits2019
Coal (thermal) k tons  ......  Subscription required
All production numbers are expressed as clean coal.
Subscription required - Subscription is required.

Operational Metrics:

Metrics2019
Coal tonnes mined 85.6 k tons of ROM coal

Reserves at June 30, 2019:

CategoryTonnage CommodityMarketable Coal
Proven 44.3 M tons Coal (thermal) 33.9 M tons
Probable 91.4 M tons Coal (thermal) 70 M tons
Proven & Probable 135.7 M tons Coal (thermal) 103.8 M tons
Measured 103 M tons Coal (thermal)
Indicated 227.3 M tons Coal (thermal)
Measured & Indicated 330.3 M tons Coal (thermal)



Heavy Mobile Equipment as of June 30, 2019:
HME TypeQuantity
Bolter ....................... Subscription required
Continuous Miner ....................... Subscription required
Feeder Breaker ....................... Subscription required
Scoop Tram ....................... Subscription required
Truck (haul) ....................... Subscription required
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 7, 2021
Subscription required - Subscription is required.

Staff:

Total WorkforceYear
Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
Feasibility Study Report 2017
Feasibility Study Report 2015
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.