Mining Intelligence and Sales Leads
Kenya

Magadi (TCML) Mine

Click for more information

Categories

Summary

Mine TypeSurface
StatusActive
Commodities
  • Trona
Mining Method
  • Dredging
Production Start... Lock
SnapshotTata Chemicals Magadi Limited (TCML) is Africa's largest Soda Ash manufacturer and among Kenya's top three exporters.

Projects related to reducing Green House Gas emission:
In July 2025, TCML launched a 5MW solar photovoltaic (PV) plant, marking a significant shift from Heavy Furnace Oil (HFO)-based calcination to renewable, low-carbon technologies.

Project Alingana, the Tata Group’s flagship sustainability initiative, aims to achieve a 30% reduction in carbon emissions by 2030 and achieve net-zero status by 2045 across all operations. TCML’s new calciner and solar infrastructure are expected to contribute effectively to this goal, making the company one of the lowest-carbonfootprint soda ash producers in the world.

Owners

SourceSource
CompanyInterestOwnership
Tata Chemicals Ltd. 100 % Indirect
Tata Chemicals Magadi Ltd. (operator) 100 % Direct
Tata Chemicals Magadi Ltd’s principal activity is the production and sale of soda ash (sodium carbonate) and salt.

Tata Chemicals Magadi Ltd.’s immediate parent undertaking is TC Africa Holdings Ltd. The ultimate parent company and controlling party in the year to 31 March 2025 was Tata Chemicals Limited, part of the global Tata group.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Magadi ward lies in the Great Rift Valley, about 120 km South West of Nairobi at a latitude of 605m (2000 feet) above sea level. Lake Magadi consists of a deep crystalline bed of Trona (the name given to the naturally occurring solid mineral content), which is a mixture of sodium sesquicarbonate, sodium chloride, other sodium salts and clays, together with a small amount of organic matter. The Trona deposit is up to 30 meters thick, and the surface of the lake covers about 80sq.Kms (Omollo, 2013).

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits2025202420232022202120202019
Trona kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe289,137 
All production numbers are expressed as soda ash. ^ Guidance / Forecast.

Operational metrics

Metrics2025202420222021
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Mine Financials

Units2025202420232022202120202019
Capital expenditures M USD  ....  Subscribe  ....  Subscribe
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 73.8  
Operating Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 5.6  
Gross profit M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 42.3  
Pre-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 2.7  
After-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 2.7  
EBITDA M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 9.9  USD
Operating Cash Flow M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 6.8  USD

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 29, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 29, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 29, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 29, 2026

Workforce

EmployeesYear
...... Subscription required 2025
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020

Aerial view:

Lock

- subscription is required.