Overview
Stage | Production |
Mine Type | Tailings |
Commodities |
|
Mining Method |
|
Production Start | ...  |
The purchase of gold-bearing surface tailings material from third parties – leveraging the excess capacity of Evander Mines’ metallurgical facilities |
Source:
Contractors
- Subscription is required.
Summary:
Deposition material of historically treated metallurgical tailings from the Kinross Mines.
Summary:
Elikhulu and Evander Tailings Retreatment Plant (ETRP) operation, now termed Elikhulu. During December 2018, the ETRP circuit was incorporated into Elikhulu to ensure more efficient recoveries of gold from the tailings being processed for the next 13 years and also to reduce unit costs of production going forward.
Retreats gold plant tailings at a rate of 1.2 million tonnes per month (including the combined throughput of ETRP).
Combined hydraulic mining will produce 1.16 Mtpm (0.2 Mtpm to ETRP and 0.96 Mtpm to Elikhulu together with the 0.04 Mtpm of RoM tailings, Elikhulu total throughput is 1 Mtpm).
Source:
Summary:

- subscription is required.
Reserves at June 30, 2018:
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven & Probable
|
36 Mt
|
Gold
|
0.29 g/t
|
0.3 M oz
|
Total Resource
|
36 Mt
|
Gold
|
0.29 g/t
|
0.3 M oz
|
Corporate Filings & Presentations:
- Subscription is required.