Overview

Mine TypeUnderground
StatusActive
Commodities
  • PGM
  • Platinum
  • Palladium
  • Rhodium
  • Gold
  • Ruthenium
  • Iridium
Mining Method
  • Breast mining
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotZondereinde Platinum Mine is an established, conventional, long-life operation which mines UG2 and Merensky ore and is located in the western limb of the Bushveld Complex.

In 2024, commissioned an additional 25 MW of diesel generators, bringing self-generation capacity on the mine to 34 MW, enabling unimpeded production under level 4 Eskom load curtailment conditions.

The development of an 80 MW solar power facility at Zondereinde is in progress. Development is in collaboration with an IPP through a PPA. Power will be supplied behind the Eskom meter, and will thus not be subject to load curtailment events.

Owners

SourceSource
CompanyInterestOwnership
Northam Platinum Ltd. 100 % Direct

Contractors

Lock

- subscription is required.

Deposit type

  • Magmatic

Summary:

The Bushveld stratigraphic sequence at Zondereinde is typical of the northern portion of the western limb. The Critical Zone stratigraphy is compressed and dominated by mafic lithologies, with the vertical separation between the Merensky and UG2 Reefs ranging between 20 m and 40 m. Both reefs dip at 20° towards the south-east and extend from a depth of 1 100 m to 3 000 m below surface.

While there is lateral continuity of both reefs across the mine property, the Merensky Reef displays a variety of reef sub-types. The distribution of these is determined from a combination of surface exploration boreholes, ongoing prospect drilling from underground development and on-reef mapping in mine excavations.

Merensky Reef
The Merensky Reef is a zone of mineralisation that straddles the base of the Merensky cyclic unit. In the area of Zondereinde mine, the Merensky Reef consists of two sub-facies of the Zwartklip facies, namely the Normal and Regional Pothole sub-facies. The latter may be further subdivided into three sub- types, each of which occurs at a specific stratigraphic level below that of the Normal subfacies. Sub- types include NP2 and P2, which constitute the main sources of ore, and FWP2 which, whilst not historically considered a primary mining target due to its undulating morphology in the central portions of the mine, is now successfully exploited in the western portion of the current mining area where it displays lesser disruption. This trend is expected to continue throughout the Western extension section.

The Mineral Resource channel is the planned mining cut on the Merensky Reef and is dependent upon the reef sub-type mined and the geozone in which it is located. In all mining cuts, the Merensky chromitite is exposed with a minimum of 10 cm of the overlying mineralised Merensky pyroxenite as hangingwall.

UG2 Reef
The UG2 Reef at Zondereinde mine is remarkably conformable when compared with the Merensky Reef. Disruption, in the form of potholes and reef rolls, is extremely limited and localised. The reef consists of three chromitite seams separated by narrow pyroxenite partings. The lower seam, termed the Main member, is generally in the order of 85 cm thick, and is overlain by two Leader seams, each in the order of 15 cm thick. The Mineral Resource channel, comprising these seams, inclusive of a 10 cm portion of mineralised reef footwall, which is the planned mining cut, is in the order of 140 cm to 160 cm thickness. There is no basis for subdividing the UG2 Reef into sub-types.

Historically, UG2 mining was limited to de-stressed areas underlying previously mined Merensky Reef. A full reef mining cut enhances metal output, hangingwall stability and safe working practices. UG2 operations are migrating to areas where there has been no previous Merensky mining. In these areas, support regimes and layouts similar to those employed on the Merensky Reef are adopted.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Concentrator recoveries for 4E run of mine ore.
CommodityProductUnits2024202320222021202020192018201720162015
4E (Pt, Pd, Rh, Au) Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Platinum Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Palladium Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Rhodium Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Gold Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Ruthenium Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Iridium Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
6E (Pt,Pd,Rh,Au,Ir,Ru) Payable metal oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Chrome Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe361341
Iridium Metal in concentrate oz  ....  Subscribe9,5629,338
Platinum Metal in concentrate oz 188,288181,624
Palladium Metal in concentrate oz 88,94786,940
Rhodium Metal in concentrate oz 26,71726,310
Gold Metal in concentrate oz 4,5144,421
Ruthenium Metal in concentrate oz 40,87240,255
4E (Pt, Pd, Rh, Au) Metal in concentrate oz 308,466299,295280,172282,765255,595
6E (Pt,Pd,Rh,Au,Ir,Ru) Metal in concentrate oz 358,900348,888
^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes milled  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,023,828 t1,932,804 t1,962,517 t2,020,425 t1,860,384 t
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,455,614 t2,274 kt2,150 kt2,245 kt2,069 kt

Production Costs

CommodityUnits20242023202220212020201920182017
Cash costs 4E (Pt, Pd, Rh, Au) ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 14,735 / oz **   13,425 / oz **  
Cash costs 6E (Pt,Pd,Rh,Au,Ir,Ru) ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 12,677 / oz **   11,521 / oz **  
Cash costs Platinum ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 24,124 / oz **   22,101 / oz **   20,890 / oz **  
^ Guidance / Forecast.
** Net of By-Product.

Operating Costs

Currency2024202320222021202020192018
Direct operating costs ($/t milled) ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Financials

Units20242023202220212020201920182017
Sustaining costs M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 68.4   249.5  
Growth Capital M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 605.6  
Capital expenditures M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 674   1,530   806.4  
Revenue M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 10,280   7,143   6,395  
Operating Income M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,311   355.4   232.5  
Pre-tax Income M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 995.3   229.2   257.1  
After-tax Income M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 726.3   142.6   184  
EBITDA M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,418   527.9  

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 14, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2024
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required ...... Subscription required ...... Subscription required 2019
...... Subscription required ...... Subscription required ...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2016
...... Subscription required 2015

Aerial view:

Lock

- subscription is required.