Mining Intelligence and News
Peru

La Zanja Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StageResidual leach
Commodities
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotLa Zanja consists of two ore deposits: San Pedro Sur and Pampa Verde.

La Zanja is a depleted mine but it is currently in the exploration stage.

During 2023, there was no mining activity in the San Pedro Sur and Pampa Verde open pits. However, the operation focused on generating 23 hectares of leaching area of the leaching PAD to recover the remaining gold and silver ounces.

Owners

SourceSource
CompanyInterestOwnership
Compania de Minas Buenaventura S.A.A. 100 % Indirect
Minera La Zanja S.R.L (operator) 100 % Direct
La Zanja is 100% held and operated by Minera La Zanja S.R.L., which is wholly owned by Compania de Minas Buenaventura S.A.A.

Deposit type

  • Vein / narrow vein
  • Epithermal
  • Porphyry

Summary:

La Zanja is located within a large area of hydrothermal alteration, mainly related to epithermal gold deposits in high sulphidation environments, in addition to some bonanza Au vein epithermal systems, Cu-Au transitional epithermal-porphyry, and breccias pipe Cu-Au-Mo. We have two-ore deposits in production in oxide material: San Pedro Sur and Pampa Verde.

Epithermal gold mineralization in oxides associated with dome edges in San Pedro and Pampa Verde deposits. Additionally, several low and intermediate-sulfidation vein systems have been recognized on the periphery, as well as copper/molybdenum/gold mineralization related to porphyry-type systems.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Gold koz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3272127140141
Silver oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe97,204217,174280,908217,292331,080
All production numbers are expressed as metal in doré. ^ Guidance / Forecast.

Operational metrics

Metrics20222021202020192018201720162015
Daily mining rate  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe1,577,645 t5,702,881 t10,694,942 t9,317,652 t8,576,614 t

Production Costs

CommodityUnits2023202220212020201920182017
Cash costs (sold) Silver USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 14.2 / oz   11.2 / oz   10.7 / oz  
Credits (by-product) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -42 / oz  
Cash costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,233 / oz   891 / oz   789 / oz  
All-in sustaining costs (AISC) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,439 / oz **  
** Net of By-Product.

Financials

Units2023202220212020201920182017
Capital expenditures M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.6   13.2   17.3  
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 43.5   96.6   165.3  
Gross profit M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -5.7   -7.5   12.1  
Operating Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -12.3   -11.8   -18.4  
Pre-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -13.9   -12.3   -19.6  
After-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -19.4   -13.5   -12.8  
Book Value M USD  ....  Subscribe  ....  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 30, 2024
....................... Subscription required ....................... Subscription required Subscription required May 23, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required ...... Subscription required ...... Subscription required 2019
...... Subscription required ...... Subscription required ...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2016

Aerial view:

Lock

- subscription is required.