Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Processing |
- ROM/dump leach
- Carbon in column (CIC)
- Merrill–Crowe
- Cyanide (reagent)
|
Mine Life | 2021 |
Source:
p. 56, 151
Compañía de Minas Buenaventura S.A.A. held a 53.06% interest in Minera La Zanja, S.R.L., which operates La Zanja mining unit. The remaining interest is held by Newmont 46.94%.
Summary:
Epithermal gold mineralization in oxides associated with dome edges in San Pedro and Pampa Verde deposits. Additionally, several low and intermediate-sulfidation vein systems have been recognized on the periphery, as well as copper/molybdenum/gold mineralization related to porphyry-type systems.
Summary:
Mining is performed via open pit, for which there are currently two pits in exploitation: San Pedro Sur and Pampa Verde. The height of the operating benches is 6 m and 12 m for th final slope, with an angle ranging from 36° to 54°. Ore is transported directly to the San Pedro Sur leach pad, 3 km from the San Pedro Sur pit and 10 km from the Pampa Verde pit. The barren material is transported to deposits located near each open pit. The material is loaded using 3 m3 excavators, and hauled using trucks with a capacity of 20 m3.
Processing
- ROM/dump leach
- Carbon in column (CIC)
- Merrill–Crowe
- Cyanide (reagent)
Source:
Summary:
The metallurgical process at La Zanja consists of leaching the ROM ore (obtained from blasting in the open pit) in the leaching heap using a cyanide solution. The solution is collected via pipes and sent to the processing plant. At the plant, two processes are performed: Merrill Crowe (zinc precipitation) and activated carbon adsorption. The precipitate obtained in the Merrill-Crowe plant and the carbon loaded with ore from adsorption plant are sent to Minera Yanacocha, where the eluent solution is desorbed and smelted, and the precipitate is smelted, obtaining doré bars.
Recoveries & Grades:
Commodity | Parameter | 2019 | 2018 | 2017 | 2016 | 2015 |
Gold
|
Head Grade, g/t
| 0.46 | 0.46 | 0.48 | 0.75 | 0.7 |
Silver
|
Head Grade, g/t
| 6.73 | 7.46 | 6.22 | 3.95 | 5.97 |
Reserves at December 31, 2019:
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven
|
354,424 t
|
Gold
|
0.4 g/t
|
4,600 oz
|
Proven
|
354,424 t
|
Silver
|
9.05 g/t
|
103,135 oz
|
Probable
|
205,741 t
|
Gold
|
0.423 g/t
|
2,801 oz
|
Probable
|
205,741 t
|
Silver
|
7.31 g/t
|
48,386 oz
|
Proven & Probable
|
560,177 t
|
Gold
|
0.41 g/t
|
7,401 oz
|
Proven & Probable
|
560,177 t
|
Silver
|
8.41 g/t
|
151,521 oz
|
Aerial view:
- Subscription is required.