Overview

Mine TypeOpen Pit & Underground
StagePermitting
Commodities
  • Nickel
  • Cobalt
  • Zinc
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
Mine Life... Lock
SnapshotDuring December 2023 quarter, key permitting milestones were achieved. Technical approval of the Plan of Economic Exploitation (PAE/Mining Lease Application) received. Environmental Impact Assessment (EIA) and Preliminary Licence (LP) also approved by Pará State Environmental Committee (COEMA).

March 1, 2024 - Centaurus reshapes Jaguar DFS to focus on concentrate project in response to changed nickel market conditions. The Centaurus Board decided to reshape the current Feasibility Study – deferring the parts of the study relating to a fully integrated downstream nickel sulphate project and focusing instead on completing the Feasibility Study based on an initial nickel concentrate-only project. The development of a potential downstream refinery can be considered in future when market conditions improve.

Centaurus is expected to deliver the Jaguar Concentrate Feasibility Study by the end of June 2024.

Owners

SourceSource
CompanyInterestOwnership
Centaurus Metals Ltd. 100 % Indirect
The JNP is 100% owned by Aliança, a wholly owned Brazilian subsidiary of Centaurus Metals Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Hydrothermal
  • IOCG
  • Magmatic
  • Breccia pipe / Stockwork
  • Vein / narrow vein

Summary:

The various deposits at the JNP differ from most nickel sulphide deposits mined to date globally because they are of hydrothermal origin, with the nickel sulphide mineralisation being of high tenor (tenor referring to the Ni concentration in 100% sulphides) with low Cr and Mg content and not directly associated with mafic-ultramafic rocks. It is interpreted that the JNP mineralisation represents a hybrid hydrothermal style between magmatic Ni-Cu-PGE sulphide and IOCG mineralisation.

The JNP is located in the Carajás Mineral Province (Carajás), which contains one of the world’s largest known concentrations of large tonnage IOCG deposits.

The Jaguar mineralised bodies are hosted within sheared sub-volcanic porphyritic dacites of the Serra Arqueada Greenstone belt, adjacent to the boundary with a tonalite intrusive into the Xingu basement gneiss, while Onça Preta and Onça Rosa are tabular mineralised bodies hosted within the tonalite. The hydrothermal alteration and mineralisation form sub-vertical to vertical bodies structurally controlled by regional ductile-brittle mylonitic shear zones.

Sulphide assemblages are similar in both ore types, differing only in modal sulphide composition and structure. The mean sulphide assemblage (in order of abundance) is pyrite, pentlandite, millerite, violarite, pyrrhotite and sphalerite with trace vaesite, nickeliferous pyrite and chalcopyrite.

The most abundant type constitutes low-grade nickel mineralisation, occurring within veins concordant with the foliation, that is associated with the biotite-chlorite alteration. The target high-grade nickel mineralisation is associated with the magnetite-apatite-quartz alteration. It occurs as veins and breccia bodies consisting of irregular fragments of extensively altered host rocks within a sulphide-magnetite-apatite rich matrix. Mineralised breccias form semi-massive sulphide bodies up to 30m thick parallel to, or crosscutting, biotite-chlorite rich zones.

Mineralisation at the Onça Preta and Onça Rosa deposits is predominantly of the second type, forming tabular semi-continuous to continuous bodies both along strike and down dip. Regolith at the deposit is in-situ and comprises a thin soil layer overlying a decomposed saprolite transitional zone. The thickness to the base of the transitional zone generally varies from 5m to 25m (max. 34m). Within the JNP tenement there are also several untested targets characterised by magnetic and/or electromagnetic anomalies located along favourable structures.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Nickel Metal in sulphide t 3,100
Nickel Metal in sulphate t 20,300262,100
Nickel Sulphate t 91,0001,175,500
Cobalt Metal in sulphide t 7,300
Zinc Metal in sulphide t 80,500

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual milling capacity  ....  Subscribe
Annual processing rate  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes milled, LOM  ....  Subscribe
* According to 2021 study.

Production Costs

CommodityUnitsAverage
Credits (by-product) Nickel USD  ....  Subscribe
Total cash costs Nickel USD  ....  Subscribe
All-in sustaining costs (AISC) Nickel USD  ....  Subscribe
C1 cash costs Nickel USD  ....  Subscribe
All-in costs Nickel USD  ....  Subscribe
Operating margin Nickel USD  ....  Subscribe
Assumed price Nickel USD  ....  Subscribe
* According to 2021 study / presentation.
** Net of By-Product.

Operating Costs

Currency2021
OP mining costs ($/t mined) USD 19.6 *  
UG mining costs ($/t mined) USD  ....  Subscribe
Combined mining costs ($/t milled) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2021 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
OP OpEx $M USD  ......  Subscribe
UG OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 944.7
G&A costs $M USD 15.1
Total OpEx $M USD  ......  Subscribe
Total Taxes $M USD  ......  Subscribe
Royalty payments $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 24, 2023
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Dec 24, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 24, 2023

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2021

Lock