Noche Buena Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StageResidual leach
Commodities
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotMining operations at the Noche Buena open pit were completed in May 2023 and the mine closure plan is proceeding as expected.

While pit operations have ceased, inventory recovery continues as long as it remains economically viable. The progressive closure plan focuses on restoring land for livestock and wildlife use, with a 20-year post-closure commitment to rehabilitation and maintenance. This includes the removal of most access roads, power corridors, and water infrastructure, while ensuring waste facilities and processing areas are safely decommissioned. Certain structures, such as leaching pads, may require extended care.

Owners

SourceSource
CompanyInterestOwnership
Industrias Peñoles SAB de CV 74.99 % Indirect
Minera Penmont, S. de R.L. de C.V (operator) 100 % Direct
Noche Buena is operated by Minera Penmont S. de R.L. de C.V as a subsidiary of Fresnillo Plc. Fresnillo is the 100 percent owner.

Fresnillo plc is 75% owned subsidiary of Industrias Peñoles SAB de CV.

Fresnillo plc is listed independently on the London Stock Exchange (LSE) and the Mexican Stock Exchange (BMV), and has its own management team, administrative structure, and governing bodies.

Deposit type

  • Vein / narrow vein
  • Hydrothermal

Summary:

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits2024202320222021202020192018201720162015
Gold oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe127,166167,208172,282182,280158,179
Silver oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe57,75451,61631,32432,63172,868

Operational metrics

Metrics202320222021202020192018201720162015
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe12,167 kt18,196 kt17,821 kt17,432 kt17,400 kt
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe48,621 kt80,305 kt85,233 kt81,423 kt82,373 kt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe12,166,900 t18,195,744 t17,820,817 t17,431,718 t17,399,931 t

Production Costs

CommodityUnits20242023202220212020201920182017
Cash costs (sold) Gold Equivalent USD  ....  Subscribe
Cash costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 847.8 / oz **   735.4 / oz **   793.5 / oz **  
All-in sustaining costs (sold) Gold Equivalent USD  ....  Subscribe
All-in sustaining costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 922.86 / oz **   1,030 / oz **   870.05 / oz **  
** Net of By-Product.

Operating Costs

Currency20232022202120202019201820172016
Total operating costs ($/t milled) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Mine Financials

Units20242023202220212020201920182017
Capital expenditures M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe 5.7   50.2   18.7  
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 176.7   211.4   215.5  
Gross profit M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 58.3   85.9   75.5  
EBITDA M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Apr 28, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 28, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required ...... Subscription required ...... Subscription required 2019
...... Subscription required ...... Subscription required ...... Subscription required 2018
...... Subscription required ...... Subscription required ...... Subscription required 2017
...... Subscription required ...... Subscription required ...... Subscription required 2016
...... Subscription required ...... Subscription required ...... Subscription required 2015

Aerial view:

Lock

- subscription is required.