Overview
Stage | Production |
Mine Type | Open Pit & Underground |
Commodities |
|
Mining Method |
- Truck & Shovel / Loader
- Sub-level caving
- Longhole open stoping
- Cemented backfill
|
Production Start | ...  |
Mine Life | 2033 |
Syama Gold Mine is a large-scale operation, comprising the established Syama Underground Mine, the Tabakoroni Complex comprising an open pit, and recently discovered underground Ore Reserve, along with several satellite oxide pits.
Mining and processing are via the Syama Underground sulphide mine and 2.4Mtpa processing plant while oxide ore is mined from the Tabakoroni complex together with multiple satellite pits and processed through a 1.5Mtpa capacity plant. |
Source:
p. 18
Syama is owned by Société des Mines de Syama S.A. (SOMISY). Resolute has an 80% interest in SOMISY and the Government of Mali holds the remaining 20%. Tabakoroni is owned by Société des Mines de Finkolo SA (SOMIFI) of which Resolute currently owns 100% through its wholly owned subsidiary, Resolute (Finkolo) Pty Ltd. The Government of Mali is entitled to a 10% free-carried interest in SOMIFI.
Contractors
- Subscription is required.
Deposit Type
- Sedimentary - Volcanogenic
- Porphyry
- Vein / narrow vein
Summary:
The Syama Project is found on the northern margin of the Achaean-Proterozoic Leo Shield which forms the southern half of the West African Craton. The project area straddles the boundary between the Kadiana–Madinani terrane and the Kadiolo terrane. The Kadiana-Madinani terrane is dominated by greywackes and a narrow belt of interbedded basalt and argillite. The Kadiolo terrane comprises polymictic conglomerate and sandstone that were sourced from the Kadiana-Madinani terrane and deposited in a late- to syntectonic basin.
Prospects are centred on the NNE striking, west dipping, Syama-Bananso Fault Zone and Birimian volcano-sedimentary units of the Syama Formation. The major commodity being sought is gold.
The Tabakoroni deposit is hosted in upright tightly folded greenstone rocks of the Syama Formation, comprising interbedded basalt and sediment units, and an overlying complex sequence of deep marine and turbiditic sediments. The sequence overlying the basalts contains interbedded carbonaceous units (silts and shales) that are preferentially deformed, and which form the Tabakoroni Main Shear Zone (TMSZ) that lies along the approximate contact of the greenstone-sediment sequence. Gold mineralisation occurs within the TMSZ associated with quartz vein stockworks and stylolitic quartz reefs.
The Tabakoroni Porphyry Zone is located on a NNE trending splay of the NNW oriented Main Tabakoroni Shear Zone. Host rocks are comprised of interbedded greywacke and shale with small intrusi ........

Mining Methods
- Truck & Shovel / Loader
- Sub-level caving
- Longhole open stoping
- Cemented backfill
Summary:
Syama is a large-scale operation which comprises two separate processing plants: a 2.4Mtpa sulphide processing circuit (ore sourced from the Syama Underground Mine) and a 1.5Mtpa oxide processing circuit (ore sourced from the Tabakoroni Open Pit Mine and near-mine oxide deposits).
Syama Gold Mine
The current mining method for underground exploitation is Sub-level caving.
Tabakoroni
A Pre-Feasibility study determined the Tabakoroni mining method would be by long hole open stoping. No Mineral Resource margin A Pre-Feasibility study determined the mining method would be by long hole open stoping. No Mineral Resource margin (external) dilution has been modelled. A minimum stope dip of 30 degrees on the footwall was applied. More rigorous mining assumptions and parameters will be applied during the conversion to Ore Reserves.
A Pre-Feasibility Study was completed on Tabakoroni Underground in late 2020.
Tabakoroni open pit has been in continuous mining operation since August 2018. During this time the performance of the open pit has shown a positive reconciliation between mineral resources and gold production and delivered positive cashflows. Data from the current open pit operations which also applies to the intended underground operation, such as existing infrastructure and ore haulage cost, were used as part of the underground study.
Long hole open stoping is considered the most suitable mining method to extract the underground deposit. Long term support will be providing b ........

Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Production:
Commodity | Units | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Gold
|
oz
| ...... ^ | ......  | ......  | ......  | 194,211 | 237,830 | 209,617 |
All production numbers are expressed as metal in doré.
^ Guidance / Forecast.
- Subscription is required.
Operational Metrics:
Metrics | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Ore tonnes mined
| ......  | ......  | 3,389,917 t | 2,804,851 t | 2,534,749 t | 1,545,506 t |
Tonnes processed
| ......  | ......  | 3,036,913 t | 3,364,308 t | 3,446,468 t | 2,755,051 t |
Plant annual capacity
| ......  | ......  | | | | 3.4 Mt |
- Subscription is required.
Reserves at December 31, 2021:
Syama Underground mine planning is based on a cut-off grade of 2g/t. Syama Satellite Reserves are reported above 1.0g/t cut-off. Tabakoroni Underground Reserves are reported above a 2.5g/t cut-off. Tabakoroni Satellite Reserves are reported above 1.1g/t cut-off.
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven
|
4,770 kt
|
Gold
|
1.7 g/t
|
258 koz
|
Probable
|
35,500 kt
|
Gold
|
2.8 g/t
|
3,150 koz
|
Proven & Probable
|
40,300 kt
|
Gold
|
2.6 g/t
|
3,400 koz
|
Measured
|
23,300 kt
|
Gold
|
3.1 g/t
|
2,290 koz
|
Indicated
|
47,800 kt
|
Gold
|
2.9 g/t
|
4,490 koz
|
Inferred
|
34,600 kt
|
Gold
|
1.7 g/t
|
1,900 koz
|
Total Resource
|
106,000 kt
|
Gold
|
2.6 g/t
|
8,670 koz
|
At Syama, water is extracted from the Bagoe River, where permitted extraction rates decrease in the dry season and no water abstraction is permitted in April each year. This is supplemented by a significant volume of accumulated rainfall that is stored in the Northern Satellite pits, along with storm and groundwater inflows into the underground mine. In addition, process water is obtained from the TSF decant water.