Malaysia
Selinsing Sulphide Expansion Mine (Selinsing)

This page is not tailored to
devices with screen width under 750 px.
 Location:
30 km NW from Kuala Lipis, Malaysia

  Regional Office:
157 Jalan Bukit Bius
Kuala Lipis
Malaysia
27200
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Malaysia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StatusArchived
Mine TypeOpen Pit
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life6 years (as of Jan 1, 2019)
At Selinsing, development work focused on completion of the Phase 1 Sulphide Project development that includes flotation plant construction and mine development, aimed to produce saleable sulphide gold concentrates.

The delivery of the fabricated concentrate filter was further delivered for shipment and an arrival is expected in mid of November 2022. Completion of commissioning is anticipated in late November 2022.

The new life of mine production will commence upon completion of the flotation plant to supply marketable sulphide gold concentrates. It is planned that the BIOX® plant will be added to the treatment process to produce gold bullion.
Latest NewsMonument Progresses Flotation Commissioning at Selinsing     February 27, 2023


Owners

Source: p. 11,12
CompanyInterestOwnership
Selinsing Gold Mine Manager Sdn. Bhd. (operator) 100 % Direct
Monument Mining Ltd. 100 % Indirect
Monument Mining's 100% owned Selinsing Gold Mine. Selinsing Gold Mine Manager Sdn. Bhd (SGMM) is 100% owned by Monument Mining Limited (Monument), a Canadian gold mining production and exploration company operating in Malaysia.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Breccia pipe / Stockwork
  • Mesothermal
  • Vein / narrow vein


Summary:

The Buffalo Reef and Selinsing gold deposits are thought to be mesothermal lode gold deposits, with auriferous quartz-pyrite- arsenopyrite±stibnite veining, with associated hydrothermal alteration. The two deposits are structurally controlled and thought to be part of the same structural trend, with the Buffalo Reef deposit occurring along strike and to the north of the Selinsing deposit.

Selinsing.
The Selinsing gold deposit is hosted by a 20 m to 100 m thick shear zone that dips 55° to 75° towards mine grid east (082° true grid). This zone or “envelope” of sheared rocks has been variably mineralised and intruded by gold-bearing quartz veins and stockworks. The quartz veins are likely to have been emplaced along fault surfaces, which are thought to be reverse thrusts caused by compression from the east. Strike-slip movement is not thought to be significant; however, a north-westerly trending structure, which post-dates the gold mineralisation, has been identified and may have a strike-slip component. The host rocks for the Selinsing shear zone consist of a series of finely interbedded argillites and very fine-grained arenites, along with sequences of quartz-rich, variably silicified sediments of likely tuffaceous origin, which are referred to as “felsic tuff” and a few thin beds of quartzite conglomerate. These host rocks are collectively known as “the mine sequence series”.

The true thickness of the mine sequence is not well understood. One inter ........


Mining Methods

  • Truck & Shovel / Loader


Summary:

The Selinsing operation consists of:
• Selinsing Gold Mine;
• Buffalo Reef Project;
• Exploration leases and blocks.

The mining method is conventional open pit drill and blast, load and haul on a 2.5 m mining flitch with a 10 m high blasting bench, reflective of semi-selective mining. The maximum excavator bucket size of 2.3 m3 is matched to this selectivity.

Open pit mining at both Selinsing and Buffalo Reef has historically been carried out by a local contractor Minetech Construction Sdn Bhd (Minetech). who has been involved in the operation since Monument acquired the operation.

The contract is current, and Minetech is responsible for the mining of ore and waste including:
• Drill and blast activities;
• Load and haul activities;
• Rehabilitation activities.

Manning of the mining fleet will be the responsibility of Minetech, but a team of professional mining personnel will service the mine in terms of:
*Mine planning and scheduling;
*Grade control and reconciliation;
*Contractor management;
*Mining related mine management.

The Selinsing Gold Mine Project (SGM) will continue to mine and process oxide material as well as process stockpile and Old Tailings material until the Selinsing Gold Sulphide Project (SGSP) production commences, when extraction of the available gold sulphide economic Mineral Resource at the SGM will commence. All remaining CIL only trea ........


Crushing and Grinding
Source: Subscription required

- subscription is required.


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnitsLOM (Projected)
Gold koz 223
All production numbers are expressed as metal in doré.


Reserves at March 31, 2018:
The Mineral Resources and Ore Reserves: above approx. 0.75 g/t Au cut-off.

CategoryOreTypeTonnage CommodityGradeContained Metal
Proven Sulphide 45 kt Gold 1.53 g/t 2 koz
Probable Sulphide 2,680 kt Gold 2.03 g/t 175.1 koz
Proven & Probable Sulphide 2,725 kt Gold 2.02 g/t 177 koz
Measured Sulphide 45 kt Gold 1.53 g/t 2 koz
Indicated Sulphide 8,052 kt Gold 1.6 g/t 415 koz
Measured & Indicated Sulphide 8,097 kt Gold 1.6 g/t 417 koz
Inferred Sulphide 5,563 kt Gold 1.79 g/t 319 koz



Proposed Heavy Mobile Equipment as of January 31, 2019:
HME TypeSizeQuantity
Truck (dump) 30 t ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 31, 2019
....................... Subscription required ....................... Subscription required Subscription required Jan 31, 2019
....................... Subscription required ....................... Subscription required Subscription required Jan 31, 2019
....................... Subscription required ....................... Subscription required Subscription required Oct 21, 2022
....................... Subscription required ....................... Subscription required Subscription required Oct 21, 2022
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 21, 2022
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
Quarterly Report 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
Subscription required - Subscription is required.

News:

NewsDate
Monument Progresses Flotation Commissioning at Selinsing February 27, 2023