Search Criteria
Asset Type        
Status
Search result: 18 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Commodity
Ore Type
Report
Year
P&P   /
M&I   /
Inclusive of Reserves
Measured Indicated Measured & Indicated
Tonnage
Grade
Content
Tonnage
Grade
Content
Tonnage
Grade
Content
AssetCommodityOre TypeReportDateMeasured TonnageMeasured GradeMeasured ContentIndicated TonnageIndicated GradeIndicated ContentM&I TonnageM&I GradeM&I ContentInclusive of Reserves
DRC
........................ Subscription required
  • Tin
Subscription required
2022
0.04 Mt
  • 2.16 %
  • 0.9 kt
3.1 Mt
  • 5.02 %
  • 154.9 kt
3.1 Mt
  • 4.98 %
  • 155.7 kt
Yes
DRC
........................ Subscription required
  • Copper
Subscription required
2022
-
  • -
  • -
-
  • -
  • -
-
  • -
  • -
DRC
........................ Subscription required
  • Copper
Subscription required
2022
90 Mt
  • 3.13 %
  • 2,812 kt
1,300 Mt
  • 2.7 %
  • 35,108 kt
-
  • -
  • -
Yes
DRC
........................ Subscription required
  • Copper
  • Cobalt
Subscription required
2023
-
  • -
  • -
  • -
  • -
279 Mt
  • 4.04 %
  • 0.61 %
  • -
  • -
-
  • -
  • -
  • -
  • -
Yes
DRC
........................ Subscription required
  • Gold
  • Gold
  • Gold
  • In-Situ (OP)
  • In-Situ (UG)
  • Total
Subscription required
2023
  • 20 Mt
  • 22.2 Mt
  • 42.2 Mt
  • 2.07 g/t
  • 5 g/t
  • 3.63 g/t
  • 1.33 M oz
  • 3.56 M oz
  • 4.89 M oz
  • 57.8 Mt
  • 46.7 Mt
  • 104.4 Mt
  • 2.03 g/t
  • 4.19 g/t
  • 3 g/t
  • 3.78 M oz
  • 6.44 M oz
  • 10.2 M oz
  • 77.8 Mt
  • 68.9 Mt
  • 146.7 Mt
  • 2 g/t
  • 4.5 g/t
  • 3.2 g/t
  • 5.11 M oz
  • 10 M oz
  • 15.1 M oz
Yes
DRC
........................ Subscription required
  • Copper
Subscription required
2022
0.7 Mt
  • 4.4 %
  • 29 kt
10 Mt
  • 5.1 %
  • 513 kt
-
  • -
  • -
Yes
DRC
........................ Subscription required
  • Copper
  • Cobalt
Subscription required
2022
-
  • -
  • -
  • -
  • -
-
  • -
  • -
  • -
  • -
-
  • -
  • -
  • -
  • -
DRC
........................ Subscription required
  • Copper
  • Cobalt
Subscription required
2019
2.2 Mt
  • 2.14 %
  • 0.07 %
  • 47 kt
  • 1 kt
42.2 Mt
  • 1.15 %
  • 0.06 %
  • 485 kt
  • 23 kt
-
  • -
  • -
  • -
  • -
Yes
DRC
........................ Subscription required
  • Copper
Subscription required
2022
-
  • -
  • -
-
  • -
  • -
-
  • -
  • 1,111 kt
Yes
DRC
........................ Subscription required
  • Copper
  • Cobalt
Subscription required
2022
-
  • -
  • -
  • -
  • -
115 Mt
  • 6 %
  • 0.5 %
  • -
  • -
-
  • -
  • -
  • -
  • -
Yes
DRC
........................ Subscription required
  • Copper
  • Cobalt
Subscription required
2022
-
  • -
  • -
  • -
  • -
56 Mt
  • 4.5 %
  • 0.6 %
  • -
  • -
-
  • -
  • -
  • -
  • -
Yes
DRC
........................ Subscription required
  • Copper
  • Cobalt
Subscription required
2022
-
  • -
  • -
  • -
  • -
21.1 Mt
  • 2.6 %
  • 0.8 %
  • -
  • -
-
  • -
  • -
  • -
  • -
Yes
DRC
........................ Subscription required
  • Cobalt
  • Copper
  • Tailings
  • Tailings
Subscription required
2021
-
  • -
  • -
  • -
  • -
-
  • -
  • -
  • -
  • -
-
  • -
  • -
  • -
  • -
  • Copper
  • Cobalt
Report
2023
180 Mt
  • 2.02 %
  • 0.65 %
  • -
  • -
70 Mt
  • 1.82 %
  • 0.81 %
  • -
  • -
249 Mt
  • 1.97 %
  • 0.69 %
  • -
  • -
Yes
DRC
........................ Subscription required
  • Gold
Subscription required
2015
20.4 Mt
  • 2.02 g/t
  • 1.33 M oz
5.2 Mt
  • 1.73 g/t
  • 0.29 M oz
25.7 Mt
  • 1.96 g/t
  • 1.62 M oz
Yes
Mineral Resources
*** Multi - mine Operation
*    Part of an Operation
Subscription required - Subscription is required.