Australia

Miitel Mine

Click for more information

Categories

Overview

Mine TypeUnderground
Commodities
  • Nickel
Mining Method
  • Longhole open stoping
  • Longitudinal stoping
  • Avoca
  • Longhole stoping
  • Overhand Cut & Fill
  • Cemented rockfill
Production Start... Lock
ShapshotThe Miitel mine was placed on care and maintenance in February 2016 following a prolonged period of low nickel prices.

The mine plan involves dewatering and rehabilitation of the mine prior to the commencement of underground extraction of the South Miitel and Burnett deposits.
Related AssetKambalda Nickel Operation

Owners

SourceSource
CompanyInterestOwnership
Wyloo Metals Pty Ltd 90.87 % Indirect
Miitel is 100% owned by Mincor Resources NL.

Mincor Resources NL was removed from the Official List at the close of trading on 25 July 2023 under Listing Rule 17.14, following compulsory acquisition of its remaining securities by Wyloo Consolidated Investments Pty Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • VMS

Summary:

In general, ore at Miitel is located at the steeply dipping contact between footwall basalt and a less competent hanging wall ultramafic unit.

The majority of the Miitel area consists of the N30 and N31 lodes. Both areas strike roughly north-south. The N31 has a strike length of ~180m, extending from ~-400m RL (~705mbs) to -300m RL (100m extent). The N30 has a strike length of ~450m, extending from ~-580m RL (~885mbs) to -430m RL (150m extent) and plunging gently to the south. Both areas consist of single lodes dipping sub-vertically (60-70°) to the east, with widths from 1-8m (N31) and 2-10m (N30).

There are two mining areas in the Burnett mine plan, being the B01 and B02 areas. Both areas strike at ~330-340°. The B01 has a strike length of ~260m, extending from ~-415m RL (~725mbs) to -290m RL (125m extent). The B02 has a strike length of ~340m, extending from ~-460m RL (~420mbs) to -310m RL (150m extent). Both areas consist of single lodes dipping sub-vertically (>80°) to the north-east, with widths ranging from 1-5m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnitsLOM (Projected)
Nickel t 9,200
All production numbers are expressed as metal in concentrate.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Source Source
Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 31, 2024

Aerial view:

Lock

- subscription is required.