Search Criteria
Asset Type        
Status
Search result: 5 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Type Production, Grades and Recovery Rates for 2017   
Asset
Mine
Project
Report
Gold Silver Copper Lead Zinc Molybdenum
Metal / Metal in conc.
Head Grade
Recovery Rate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
koz g/t % koz g/t % kt M lbs % % % kt M lbs % % % kt M lbs % % % kt M lbs % % %
AssetMineProjectReportGoldGold HGGold RRSilverSilver HGSilver RRCopper Conc.CopperCopper HGCopper RRCopper CGLead Conc.LeadLead HGLead RRLead CGZinc Conc.ZincZinc HGZinc RRZinc CGMolybdenum Conc.MolybdenumMolybdenum HGMolybdenum RRMolybdenum CG
India
........................ Subscription required
Subscription required
      
      
      
778  
38.2  
68.9      
    
    
    
    
    
20  
1.4  
63.9  
    
    
187  
10  
92  
    
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
902  
56.2  
67.6      
    
    
    
    
15  
13  
1.2  
69  
41  
65  
71  
5.2  
83.8  
48.9  
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
5,810  
50.8  
68.9      
    
    
    
    
    
99  
1.7  
    
    
    
1,065  
12.2  
    
    
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
10  
113  
89.6      
    
    
    
    
109  
132  
2  
88.1  
55.8  
231  
258  
3.8  
91  
50.9  
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
1,499  
41.3  
77.3      
    
    
    
    
3  
66  
2.1  
90.5  
    
3  
85  
2.7  
90.2  
    
    
    
    
    
    
Key Personnel
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
¨  Combined production. Please see the Property Profile for details.
Subscription required - Subscription is required.