Search Criteria
Asset Type        
Status
Search result: 14 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Type Production, Grades and Recovery Rates for 2017   
Asset
Mine
Project
Report
Gold Silver Copper Lead Zinc Molybdenum
Metal / Metal in conc.
Head Grade
Recovery Rate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
koz g/t % koz g/t % kt M lbs % % % kt M lbs % % % kt M lbs % % % kt M lbs % % %
AssetMineProjectReportGoldGold HGGold RRSilverSilver HGSilver RRCopper Conc.CopperCopper HGCopper RRCopper CGLead Conc.LeadLead HGLead RRLead CGZinc Conc.ZincZinc HGZinc RRZinc CGMolybdenum Conc.MolybdenumMolybdenum HGMolybdenum RRMolybdenum CG
Argentina
........................ Subscription required
Subscription required
188  
      
      
306  
      
          
73  
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Argentina
........................ Subscription required
Subscription required
      
      
      
      
      
          
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Argentina
........................ Subscription required
Subscription required
17  
2.6  
      
1,411  
215.5  
          
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Argentina
........................ Subscription required
Argentina
........................ Subscription required
Subscription required
452  
14.3  
96  
3,504  
126.5  
86      
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Argentina
........................ Subscription required
Subscription required
306  
7.5  
      
6,300  
      
          
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Argentina
........................ Subscription required
Argentina
........................ Subscription required
Subscription required
154  
1  
57  
      
      
          
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Argentina
........................ Subscription required
Argentina
........................ Subscription required
Argentina
........................ Subscription required
Argentina
........................ Subscription required
Argentina
........................ Subscription required
Subscription required
100  
6.7  
87.4  
6,448  
436  
86.3      
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Report
576  
1  
      
      
      
          
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Key Personnel
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
¨  Combined production. Please see the Property Profile for details.
Subscription required - Subscription is required.