Search Criteria
Asset Type        
Status
Search result: 2 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Commodity Product Unit Annual Production: Mines Production: Projects
2023 2022 2021 2020 2019 2018 2017 2016 Annual LOM
AssetCommodityProductUnits20222019201820172016201520142013Avg. AnnualLOM
Niger
............................ Subscription required
  • Uranium
  • U3O8
  • M lbs
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2.9
  • 68
Niger
............................ Subscription required
  • Uranium
  • Molybdenum
  • U3O8
  • Sulfide
  • M lbs
  • M lbs
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2.7
  • 0.3
  • 51
  • 5.2
Production
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ  Combined production. Please see the Property Profile for details.
Concentrate: wmt numbers are converted to kt based on 9% moisture assumption
Subscription required - Subscription is required.