Search Criteria
Asset Type        
Status

Search result: 3 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Type Commodity Costs (2019) Mining & Processing Costs (2019)   
Asset
Mine
Project
Currency
Commodity
Cash Costs  /  C1
Total Cash Costs / C2
 AISC
 All-in Costs  /  C3
Currency
$/t mined $/t milled
Open Pit
Underground
Combined
Open Pit
Underground
Combined
Direct
Processing
G&A
Total
AssetMineProjectCurrencyCodeCommodityCash CostsTotal Cash CostsAISCAll-in CostsCurrency MiningOP MinedUG MinedBlended Op/UG MinedOP MilledUG MilledBlended Op/UG MilledDirectProcessingG&ATotal Milled
Honduras
............................ Subscription required
USD
  • Lead
  • Silver
  • Zinc
  • Zinc Eq.
  • -
  • -
  • -
  • 0.7 /lb`
  • -
  • -
  • -
  • 1.14 /lb`
USD
82.64
Honduras
............................ Subscription required
USD
  • Lead
  • Silver
  • Zinc
  • Zinc Eq.
  • -
  • -
  • -
  • 0.58 /lb`
  • -
  • -
  • -
  • 0.97 /lb`
USD
43.57109.9863.55
Honduras
............................ Subscription required
USD
  • Gold
  • Gold Eq.
  • 931 /oz
  • -
Production
Assets:
*** Multi - mine Operation
*    Part of an Operation
Costs:
^   Guidance or Forecast
**   Net of By-Product
` or Eq. - Equivalent
Subscription required - Subscription is required.