Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ... |
Mine Life | 2031 |
Tyrone mine is an open-pit copper mining complex with processing facilities consisting of a SX/EW operation. |
Source:
p. 4,16,219
Company | Interest | Ownership |
Freeport-McMoRan Inc.
|
100 %
|
Indirect
|
Freeport-McMoRan Tyrone Inc.
(operator)
|
100 %
|
Direct
|
Freeport-McMoRan owns 100% of Tyrone mine through its wholly-owned subsidiary Freeport-McMoRan Tyrone Inc.
Contractors
- Subscription is required.
Summary:
The Tyrone mine is a porphyry copper deposit. Mineralization is predominantly secondary sulfide consisting of chalcocite, with leachable oxide mineralization consisting of chrysocolla.
Summary:
Tyrone mine is an open-pit copper mining complex and has been in operation since 1967.
The highest bench elevation is 2,070 meters above sea level and the ultimate pit bottom is expected to have an elevation of 1,475 meters above sea level.
Mine operations begin with drilling, blasting and loading copper bearing ore or waste rock within the active areas of the openpit mine. Drilling is performed with electric mobile drills. Blast holes are drilled to a depth of approximately 53 feet and are filled with blasting agents to a depth of approximately 31 feet. The remaining top 22 feet are filled with stemming material, which is a sand and gravel mixture. Blast holes are drilled on an approximate 24 to 30 feet spacing. Once the rock is blasted, electric shovels and/or loaders are moved into place to load haul trucks that deliver rock to stockpiles for leaching, or waste.
The available mining fleet consists of nine 240-metric-ton haul trucks loaded by 1 electric shovel with a bucket size of 47 cubic meters, which is capable of moving an average of 108,000 metric tons of material per day.
Flow Sheet:
Summary:
- subscription is required.
Source:
- subscription is required.
Reserves at December 31, 2023:
Mineral Reserves Cut-off grade for ROM leach is 0.03 % Cu.
Mineral Resources Cut-off grade for ROM leach is 0.01 % Cu.
Category | OreType | Tonnage | Commodity | Grade | Contained Metal | Recoverable Metal |
Proven
|
ROM leach
|
76 Mt
|
Copper
|
0.17 %
|
|
|
Probable
|
ROM leach
|
14 Mt
|
Copper
|
0.17 %
|
|
|
Proven & Probable
|
ROM leach
|
90 Mt
|
Copper
|
0.17 %
|
B lbs
|
0.2 B lbs
|
Proven & Probable
|
Stockpiles
|
1,213 Mt
|
Copper
|
0.28 %
|
B lbs
|
0.1 B lbs
|
Measured
|
ROM leach
|
60 Mt
|
Copper
|
0.26 %
|
|
|
Indicated
|
ROM leach
|
11 Mt
|
Copper
|
0.23 %
|
|
|
Inferred
|
ROM leach
|
5 Mt
|
Copper
|
0.28 %
|
|
|
Total Resource
|
ROM leach
|
76 Mt
|
Copper
|
0.26 %
|
0.4 B lbs
|
|
Heavy Mobile Equipment as of December 31, 2023:
HME Type | Size | Quantity |
Shovel - EV
|
47 m3
|
.......................
|
Truck (haul)
|
240 t
|
.......................
|