Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ... |
Mine Life | 2122 |
In 2019, the White Mountain project began mining and shipping anorthosite product.
Lumina Sustainable Materials A/S (formerly Hudson Greenland A/S) is a majority privately-owned business. We are shipping our key mineral Anorthosite from our plant in Greenland to customers on 3 continents.
We develop high impact products that extend beyond industrial minerals through custom chemistry and processing solutions.
Mine production numbers have not been publicly since 2021. |
Source:
p. 3
The Hudson currently has a 31.1% equity interest in Lumina Sustainable Materials A/S (formerly Hudson Greenland A/S), which in turn owns 100% of the White Mountain Project in Greenland.
Contractors
- Subscription is required.
Summary:
Metamorphosed calcic anorthosites form one of the most distinctive rock units in the Archean gneiss complex of West Greenland. These anorthosites are of special interest because of their unusual composition with extremely calcic plagioclase, low-levels of extraneous mineral contaminates, and extensive preservation of primary igneous textures and minerals. These unique mineral-chemical attributes are directly linked to their potential use in various industrial mineral applications, in particular, their use as an alternative source of raw material for the aluminum industry.
Mineralization on the property consists of anorthosite with minor muscovite (2%) and clinozoisite (3%). Rutile, pyrite and biotite are present in extremely small amounts («1%) Thin section petrographic analysis (Le Couteur, 2012) indicates the anorthosite is composed of approximately 95% plagioclase. The rock is hard, massive and has an off-white colour with some vaguely defined patches having a faint brownish cast. The plagioclase varies in grain size up to about 30 mm across. The brownish-tinged patches appear to be large single crystals. The rock is described as coherent but crazed with fine fractures radiating in all directions, indicating the impact of tecto-morphism activity. Pale yellow clinozoisite grains up to 8 mm across, but typically less than 2 mm, account for about 2% of the rock mass. The clinozoisite grains are scattered throughout the rock mass, with some strung along fractures or ........
Summary:
The exploitation license was granted for 30 years with a 20-year extension allowable. The mine has a current mine life of over 100 years with the deposit being open in all directions.
Mining at the White Mountain site consists of a simple drill and blast operation in an open pit where there is no overburden that needs to be removed prior to extraction. Mining is done with 10m benches. After blasting, the ‘shot rock’ is loaded into 35 and 40 tonne articulated haul trucks that carry the ore 11 kilometres down to the waterside processing plant. The haul trucks are operating downhill when loaded, which represents a considerable fuel saving that, together with the absence of overburden on the mineral resource, means a very cost-effective open pit mining operation.
Source:
Source:
- subscription is required.
Flow Sheet:
Summary:
- subscription is required.
Source:
- subscription is required.
Production:
By-products: Calcium Silicate (Wollastonite) and Amorphous Silica.
Commodity | Units | 2020 |
Anorthosite
|
t
| ...... |
All production numbers are expressed as mineral.
- Subscription is required.
Operational Metrics:
Metrics | 2019 |
Annual production capacity
| 200 kt of anorthosite mineral |
Reserves at December 9, 2015:
Since December 9, 2015, Mineral Resources for the White Mountain project have not been recalculated.
Category | OreType | Tonnage | Commodity | Grade |
Indicated
|
Anorthosite
|
27,384 kt
|
Al2O3
|
30 %
|
Indicated
|
Anorthosite
|
27,384 kt
|
Silica
|
49.2 %
|
Indicated
|
Anorthosite
|
27,384 kt
|
CaO
|
14.95 %
|
Inferred
|
Anorthosite
|
32,724 kt
|
Al2O3
|
30.1 %
|
Inferred
|
Anorthosite
|
32,724 kt
|
Silica
|
49.4 %
|
Inferred
|
Anorthosite
|
32,724 kt
|
CaO
|
15.01 %
|
HME Type | Model | Size | Quantity | Ref. Date | Source |
Crane
|
|
35 t
|
.......................
|
Mar 31, 2017
|
p.4
|
Crane
|
|
90 t
|
.......................
|
Mar 31, 2017
|
p.4
|
Drill
|
.......................
|
|
.......................
|
Sep 30, 2018
|
p.4
|
Excavator
|
|
30 t
|
.......................
|
Mar 31, 2017
|
p.4
|
Loader
|
.......................
|
|
.......................
|
Sep 30, 2018
|
p.4
|
Truck (haul)
|
|
40 t
|
|
Mar 31, 2020
|
p.4
|
Truck (haul)
|
|
35 t
|
|
Mar 31, 2020
|
p.4
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.